20 November 2026
Kenya carbon research snapshot
Evidence across 530 working activities and 607 primary registry listings. Multiple listings can describe one activity. The distinct physical-project total remains open.
Institutional evidence for 37 activities
Findings at this cutoff
97 have pooled context only. The checked ledger has no issuance record for 258.
In the R122 projection. The broader saved numeric screen covers 275 activities and includes other quantity types.
Two changes in the working export add three activity placements. The accepted count anchors this snapshot.
One has arrangement context only. Source comparison is pending for 26. The statements cover different evidence stages.
Saved ordinary-credit accounting attributes 100,235,368.88 original units to 275 activity rows. Its baseline includes 442 unallocated units. Shares use that baseline. The direct-issuance coverage count uses a separate registry-record test. Temporary credits remain separate.
Site update · 21 November 2026: the R656 accepted edition-grade overlay now reports 567 verified close-read, 274 whole semantic scopes with visual proof separate, and 3,012 without a joined grade across 3,853 document/workbook editions. This update reuses accepted reading scopes and adds no read credit. Other snapshot figures below retain their stated evidence cutoffs.
R656 CO₂ design forecasts
Three activity-specific forecasts are now linked from the accepted CO₂ handoff. They are ex-ante design estimates, not measured or verified removals and not issued credits. Two Kilifi entries share a common-baseline sampling cohort; their values are not pooled tonnes or issuance allocations. Download the public R656 forecast records.
- Gold Standard GS7516 · GS1366 VPA 19 Kilifi Borehole Rehabilitation: PDD forecast of 10,000 tCO₂e per year; its Year A–E table sums to 50,000 tCO₂e. This is common-baseline cohort context, not a pooled or allocated total.
- JCM KE001 · Ultra Low Head Micro Hydro: PDD forecast of 20 tCO₂e in 2018 and 82 per year for 2019–2026, total 676 tCO₂e. The five numbered “Issued” blocks are template placeholders; the checked official records show no issuance event or amount, so the project issuance total remains unknown.
- Gold Standard GS7562 · GS1366 VPA 27 Kilifi Borehole Rehabilitation: PDD forecast of 10,000 tCO₂e per year; its first-period table sums to 50,000 tCO₂e for 20 September 2019–19 September 2024. The shared-cohort context is not a pooled total or parent issuance allocation.
Physical benefits in the source records
Paradigm cookstoves · VCS1918
The Paradigm project verification report covers 26 April 2017 through 25 April 2019. Its three stove-model counts sum to 50,491 stove units.
- 11,071 Burn improved charcoal stoves.
- 18,011 Envirofit CH5300 charcoal stoves.
- 21,409 improved wood cookstoves.
The verifier visited one shared sample of 11 randomly selected households. The stove counts describe units and the number of distinct households remains unresolved. Source · VCS verification report 29481, PDF p. 27.
Nearly 200 institutional stoves were separately reported as distributed to schools by the proponent and its partner in an earlier project description. That approximate stove count is outside the 50,491-unit subtotal. Source · GS966 Paradigm Kenya project description 27724, PDF p. 25.
Chyulu Hills school water installations · VCS1408
- Six schools, proponent report. The Chyulu Hills project reports that water tanks and catchment systems were installed at six schools in the eastern community. The report covers 1 January 2017 through 31 December 2020. Source · monitoring report 78593, PDF pp. 152 and 202 (SIA24).
- One named school, verifier site visit. Aster Global lists the Ilani Boys High School water-tank replacement in its 11 August 2021 field visit. Source · verification report 78591, PDF pp. 10–11 (§2.5).
The cited pages leave Ilani’s inclusion in the six-school count unresolved. The six counts schools, and the sources leave site-by-site tank counts and capacities unspecified.
Browse the 530 activities
Technology-family labels cover the 70 Verra activities with those labels in the saved register. Methodology fields preserve the scope of declarations and leads.
How to interpret the evidence
- CO₂ quantities retain their period and evidence stage. Forecasts, monitored results, verifier results and issued credits are distinct measures.
- A registry transaction or documented allocation supports the assignment of credits to an activity. Record buyers, account holders, retirement beneficiaries and benefit recipients as separate roles.
- Evidence for a current managing appointment, consent, FPIC, land rights or benefit sharing is dated and instrument-specific.
- GS5642 is a historical carve-out from GS966. VCS2349 and VCS3206 form a documented numbered series. Evidence for shared operations and pooled credit allocation remains open.
Explore the underlying activity evidence and managing-entity review.