Where credits go first
Browse expected first accounts by registry and project. Open a listing to trace its default route, transfer and agency forms, and recorded issuance evidence.
Browse the 530-project overview →BioLite: issuances reported 6 November 2026
Gold Standard shows three additional issuing listing facets after the earlier 313-listing working cut. A separately dated view would contain 316 issuing facets across the same 281 working project groups; these are existing CDM-linked projects, not three new project groups. The roster and counts below retain the earlier cut.
- GS11885 · CPA 062: 13,438 VERs (11,567 and 1,871).
- GS11886 · CPA 063: 5,586 VERs.
- GS11887 · CPA 064: 67 VERs.
These four 2024-vintage rows total 19,091 gross Gold Standard VERs. Their 2024 periods do not overlap the CDM programme records checked through 2020. Broader serial and mitigation overlap has not been ruled out, so they are not added to a net unique-credit total. The pages name BioLite, Inc. as developer: under the Gold Standard project-account baseline it is a working recipient candidate. The first receiving accounts and project-specific routing exceptions remain unverified.
Full recipient reports
The recipient listings use a 316-facet register, including three later BioLite facets; some older reports retain the 313-listing cut. The Verra report is a separate event-level view with 344 issuance roots across 32 listing IDs; the event rows are not extra listings and the denominators should not be added together. Registry baselines and named candidates do not by themselves establish actual receipt.
- Farm Africa and CGA-linked Acorn transaction records — dated registry captures and the separate WETPA record.
- Verra 344 event-root timeline (R01) — represented clocks, monitoring periods, route candidates and checked form matches.
- Working issuance and recipient timeline (V02)
- Full listing routes and instrument details
- Additional listing, agency and allocation evidence
- Tana and Olkaria II issuance chronology
- Olkaria I, Olkaria IV and Ngong issuance chronology
- Routes by initiative (initiative scopes overlap).
Loading the routing view…