Improved Cookstove Distribution in Kenya by EKI Phase 0 2

This Kenya project is filed under Energy efficiency, uses a methodology not established in the current projection, and Verra lists its current registry status as Under validation (Public comment period closed).

Registry statusUnder validation (Public comment period closed)5. Registering · evidence-based lifecycle, not an issuance determination
Project type · as filedEnergy efficiency1 source receipt
MethodologyAMS-II.G · VMR0006
Project proponent · as filedEKI Energy Services LimitedVerra project-detail profile captured 9 Aug 2026 · 1 separately human-tagged filed-role card retained in Institutions

Registry facts and project documents are shown with their limits. An entry is not an independent verification.

Loading selected images…

Issued0VCUs recorded
Retired0VCUs recorded
Active holdings0VCUs recorded
Institutions1reviewed cards
Documents3current Registry listings

Open this project's map and codebook editor →

Institution map · layer 01

Who sits above and beside this project?

0 graph-eligible filed roles · 0 source-only authority candidates · 0 public-context cards kept outside the graph · 1 proponent as filed · 1 project-specific exact identity mark.No project-specific public-authority edge recovered · evidence gap, not absence

Open this project in the all-registry institutional map →

Current-law context · not a project finding

National Environment Management Authority (Kenya)

NEMA operates Kenya’s DNA and environmental-approval functions today; this box does not prove a project-specific historical action.

Current-law context · exact county not inferred

Relevant county government

County support or approvals depend on project location, activity, and date; no named county or county seal is invented where the held record is silent.

Evidence layerOversight, audit and reportingNo solid arrows approved
Project-specific evidence gapNo oversight, audit, registry, or monitoring relationship has yet cleared the bounded institution-card filter.

This is a bounded evidence state—not proof that no authority or auditor exists.

Project anchor

Project proponent as filed

EKI Energy Services Limited

The captured Verra project profile names EKI Energy Services Limited as a project proponent; this does not independently establish ownership, control, payment, or performance.

Open exact entity record →
How to read this layer

Dashed links preserve an owner-supported filed role; dotted links still need revision. Neither is a directional arrow. Solid arrows stay unavailable until an exact action, direction, period, and source receipt are separately approved.

The institutions connected to this project.

1 cards preserve names and roles found in project evidence, linked to 4 source excerpts. A visual connection will not be treated as a factual relationship without a source.

EK
SUPPORT BOUNDED ROLE

EKI Energy Services Limited

project proponent

4 linked source excerpt(s)