Who approved what?
Open an activity to see Kenya’s reported action, the institutions involved, its registry links and the evidence still needed.
21 retained Kenya-linked entries, including multi-country programmes. Status snapshot: 4 September 2026; role research: 1 October 2026. These are not 21 distinct Kenyan sites or 21 authorizations for Article 6 international use.
What changes compared with Verra or Gold Standard?
| Decision | Who acts | What it establishes |
|---|---|---|
| Verra certification | Project proponent, independent VVB, Verra | The VVB audits the design or monitoring period. Verra reviews the request; verification approval can lead to an issuance request for VCUs. |
| Gold Standard certification | Developer / programme manager, approved VVB, Gold Standard assurance review | For new reviews from 5 December 2024, the VVB takes the certification decision after expert review and public consultation. Historical reviews can follow the prior process. |
| Kenya national oversight | Kenya’s designated authorities | Domestic procedures apply to voluntary and compliance markets. A concept-note listing, no-objection and project approval are different milestones. |
| CDM transition to Article 6.4 | Kenya’s designated national authority, activity participants, UN mechanism | Host approval allows the transition process to advance. UN registration and any later issuance are separate decisions. |
| Article 6 international use | Participating governments and their accounting / registry systems | A specific authorization sets the permitted use and scope. The corresponding adjustment addresses national accounting; a project listing alone proves neither. |
A government, funder, buyer, developer and auditor are different roles. A CDM “authorized participant” is not automatically authorized to transfer Paris Agreement mitigation outcomes.
UNFCCC CDM 10341MicroEnergy Credits – Microfinance for Clean Energy Product Lines – Africa
CDM transition approvedEfficient appliancesMulticountry programme with Kenyan component activities · programme · 2026-09-04
MicroEnergy Credits – Microfinance for Clean Energy Product Lines – Africa
CDM transition approvedEfficient appliancesMulticountry programme with Kenyan component activities · programme · 2026-09-04
Kenya’s action and project status
Kenya is reported to have approved this legacy CDM activity’s transition to the UN Paris Agreement Crediting Mechanism. The Kenya approval instrument and its included components have not been read; this is not a verified authorization for Article 6 international use.
- Reported status
- Host-approved CDM transition (UNEP classification) · 2026-09-04. This source date is not necessarily the date of the approval.
- Decision document
- Underlying Kenyan decision not inspected. The tracker’s status is retained; the decision date and exact component scope remain unverified.
- International-use authorization
- Not verified in this review. No inspected instrument establishes the authorized quantity, vintages and uses for this entry.
- Corresponding adjustment
- No project-specific accounting record verified in this review. This is an evidence gap, not a finding that no adjustment exists.
Institutions and their capacity
These are dated roles in the cited mechanism. A historical CDM participant, auditor or funder is not automatically a current Article 6 partner.
| Institution | Capacity | Status and evidence |
|---|---|---|
| MicroEnergy Credits Corp | Coordinating/managing entity and authorized participant CDM programme or project | Listed in CDM recordRole source Observed 2026-10-01 |
| Swedish Energy Agency | Authorized CDM participant listed under Sweden CDM programme or project | Listed in CDM recordRole source Observed 2026-10-01 |
| TÜV NORD | Designated operational entity (DOE) listed for the CDM programme CDM programme or project | Listed in CDM recordRole source Observed 2026-10-01 |
Connection to other registries
Exact retained Verra official names contain parent CDM10341 and CPA0001,0002,0003. This confirms the three component identities, not a whole multicountry programme total.
- Verra VCS · VCS2835
Documented component or CER-conversion relation; unit duplication not established - Verra VCS · VCS2836
Documented component or CER-conversion relation; unit duplication not established - Verra VCS · VCS2837
Documented component or CER-conversion relation; unit duplication not established
What needs checking next
- Inspect the PACM transition submission: addendum if retaining a CDM methodology, or revised design documents and PACM-accredited DOE validation if adopting a PACM methodology; do not assume the legacy DOE remains appointed.
- Kenya DNA A6.4-FORM-AC-003 transition approval and any annex defining included CPAs
- Formal PACM registration/transition decision and effective date
- Separate international-use authorization, authorized quantity/vintages/use and corresponding-adjustment evidence, if any
- Match specific components and periods before any unit-level or credit deduplication. Identity overlap alone is not duplicate issuance.
Named roles from selected public records; not a complete institutional crawl. A linked activity is not evidence of duplicate issued units.
UNFCCC CDM 10476KOKO Kenya - Ethanol Cookstoves Program
CDM transition approvedCleaner cookingKenya-linked; country filter does not establish entire programme scope · programme · 2026-09-04
KOKO Kenya - Ethanol Cookstoves Program
CDM transition approvedCleaner cookingKenya-linked; country filter does not establish entire programme scope · programme · 2026-09-04
Kenya’s action and project status
Kenya is reported to have approved this legacy CDM activity’s transition to the UN Paris Agreement Crediting Mechanism. The Kenya approval instrument and its included components have not been read; this is not a verified authorization for Article 6 international use.
- Reported status
- Host-approved CDM transition (UNEP classification) · 2026-09-04. This source date is not necessarily the date of the approval.
- Decision document
- Underlying Kenyan decision not inspected. The tracker’s status is retained; the decision date and exact component scope remain unverified.
- International-use authorization
- Not verified in this review. No inspected instrument establishes the authorized quantity, vintages and uses for this entry.
- Corresponding adjustment
- No project-specific accounting record verified in this review. This is an evidence gap, not a finding that no adjustment exists.
Institutions and their capacity
These are dated roles in the cited mechanism. A historical CDM participant, auditor or funder is not automatically a current Article 6 partner.
| Institution | Capacity | Status and evidence |
|---|---|---|
| KOKO Networks Limited | Coordinating/managing entity and authorized participant CDM programme or project | Listed in CDM recordRole source Observed 2026-10-01 |
| Ecoeye Co., Ltd. | Authorized CDM participant listed under Republic of Korea CDM programme or project | Listed in CDM record Current indexed official page lists an add-participant MoC dated 12 August 2026; the instrument itself was not read. Do not infer a Paris authorization or buyer contract. Role sourceObserved 2026-10-01 |
| Earthood | Designated operational entity (DOE) listed for the CDM programme CDM programme or project | Listed in CDM recordRole source Observed 2026-10-01 |
Connection to other registries
GS10884 design document identifies KOKO and links the exact UNFCCC PoA URL; official UNFCCC page identifies that URL as10476.
- Gold Standard · GS10884 · View our category record
Documented programme/component or certification link; unit duplication not established
What needs checking next
- Inspect the PACM transition submission: addendum if retaining a CDM methodology, or revised design documents and PACM-accredited DOE validation if adopting a PACM methodology; do not assume the legacy DOE remains appointed.
- Kenya DNA A6.4-FORM-AC-003 transition approval and any annex defining included CPAs
- Formal PACM registration/transition decision and effective date
- Separate international-use authorization, authorized quantity/vintages/use and corresponding-adjustment evidence, if any
- Match specific components and periods before any unit-level or credit deduplication. Identity overlap alone is not duplicate issuance.
Named roles from selected public records; not a complete institutional crawl. A linked activity is not evidence of duplicate issued units.
UNFCCC CDM 10515Kenya Solar Lighting CDM Programme of Activities
CDM transition approvedSolar energyKenya-linked; country filter does not establish entire programme scope · programme · 2026-09-04
Kenya Solar Lighting CDM Programme of Activities
CDM transition approvedSolar energyKenya-linked; country filter does not establish entire programme scope · programme · 2026-09-04
Kenya’s action and project status
Kenya is reported to have approved this legacy CDM activity’s transition to the UN Paris Agreement Crediting Mechanism. The Kenya approval instrument and its included components have not been read; this is not a verified authorization for Article 6 international use.
- Reported status
- Host-approved CDM transition (UNEP classification) · 2026-09-04. This source date is not necessarily the date of the approval.
- Decision document
- Underlying Kenyan decision not inspected. The tracker’s status is retained; the decision date and exact component scope remain unverified.
- International-use authorization
- Not verified in this review. No inspected instrument establishes the authorized quantity, vintages and uses for this entry.
- Corresponding adjustment
- No project-specific accounting record verified in this review. This is an evidence gap, not a finding that no adjustment exists.
Institutions and their capacity
These are dated roles in the cited mechanism. A historical CDM participant, auditor or funder is not automatically a current Article 6 partner.
| Institution | Capacity | Status and evidence |
|---|---|---|
| Rural Electrification and Renewable Energy Corporation (REREC) | Coordinating/managing entity and authorized participant CDM programme or project | Listed in CDM recordRole source Observed 2026-10-01 |
| International Bank for Reconstruction and Development (IBRD) | Authorized CDM participant as trustee of the Carbon Initiative for Development (Ci-Dev) CDM programme or project | Listed in CDM record Listed participation end: 2026-12-31 Role sourceObserved 2026-10-01 |
| Swedish Energy Agency | Authorized CDM participant listed under Sweden CDM programme or project | Listed in CDM record Listed participation end: 2026-12-31 Role sourceObserved 2026-10-01 |
| TÜV NORD | Designated operational entity (DOE) listed for the CDM programme CDM programme or project | Listed in CDM recordRole source Observed 2026-10-01 |
Connection to other registries
Exact official CDM record is identified. No documentary GS/Verra/PV identity was established after the bounded all-inventory crosswalk. This does not prove the activity is new or has no other registry registration.
No documentary link to a retained voluntary-registry entry established here.
What needs checking next
- Inspect the PACM transition submission: addendum if retaining a CDM methodology, or revised design documents and PACM-accredited DOE validation if adopting a PACM methodology; do not assume the legacy DOE remains appointed.
- Kenya DNA A6.4-FORM-AC-003 transition approval and any annex defining included CPAs
- Formal PACM registration/transition decision and effective date
- Separate international-use authorization, authorized quantity/vintages/use and corresponding-adjustment evidence, if any
- Find an explicit GS/Verra/PV ID linked to CDM10515 or CPA0001/0002; do not substitute another solar-lighting programme.
Named roles from selected public records; not a complete institutional crawl. A linked activity is not evidence of duplicate issued units.
UNFCCC CDM 3773Olkaria II Geothermal Expansion Project
CDM transition approvedGeothermalKenya-linked; country filter does not establish entire programme scope · project · 2026-09-04
Olkaria II Geothermal Expansion Project
CDM transition approvedGeothermalKenya-linked; country filter does not establish entire programme scope · project · 2026-09-04
Kenya’s action and project status
Kenya is reported to have approved this legacy CDM activity’s transition to the UN Paris Agreement Crediting Mechanism. The Kenya approval instrument and its included components have not been read; this is not a verified authorization for Article 6 international use.
- Reported status
- Host-approved CDM transition (UNEP classification) · 2026-09-04. This source date is not necessarily the date of the approval.
- Decision document
- Underlying Kenyan decision not inspected. The tracker’s status is retained; the decision date and exact component scope remain unverified.
- International-use authorization
- Not verified in this review. No inspected instrument establishes the authorized quantity, vintages and uses for this entry.
- Corresponding adjustment
- No project-specific accounting record verified in this review. This is an evidence gap, not a finding that no adjustment exists.
Institutions and their capacity
These are dated roles in the cited mechanism. A historical CDM participant, auditor or funder is not automatically a current Article 6 partner.
| Institution | Capacity | Status and evidence |
|---|---|---|
| Kenya Electricity Generating Company Plc. (KenGen) | Authorized CDM participant CDM programme or project | Listed in CDM recordRole source Observed 2026-10-01 |
| Netherlands’ Ministry of Infrastructure and the Environment (IenM) | Former authorized CDM participant CDM programme or project | Withdrawn Withdrawn: 2020-11-17 Role sourceObserved 2026-10-01 |
| International Bank for Reconstruction and Development (IBRD) | Former authorized CDM participant as trustee of the Community Development Carbon Fund (CDCF) CDM programme or project | Withdrawn Withdrawn: 2020-08-11 Role sourceObserved 2026-10-01 |
Connection to other registries
Exact official CDM record is identified. No documentary GS/Verra/PV identity was established after the bounded all-inventory crosswalk. This does not prove the activity is new or has no other registry registration.
No documentary link to a retained voluntary-registry entry established here.
What needs checking next
- Inspect the PACM transition submission: addendum if retaining a CDM methodology, or revised design documents and PACM-accredited DOE validation if adopting a PACM methodology; do not assume the legacy DOE remains appointed.
- Kenya DNA A6.4-FORM-AC-003 transition approval and any annex defining included CPAs
- Formal PACM registration/transition decision and effective date
- Separate international-use authorization, authorized quantity/vintages/use and corresponding-adjustment evidence, if any
- No exact voluntary ID established. Olkaria II is distinct from VCS881 Olkaria III Phase2.
Named roles from selected public records; not a complete institutional crawl. A linked activity is not evidence of duplicate issued units.
UNFCCC CDM 4513Lake Turkana 310 MW Wind Power Project
CDM transition approvedWindKenya-linked; country filter does not establish entire programme scope · project · 2026-09-04
Lake Turkana 310 MW Wind Power Project
CDM transition approvedWindKenya-linked; country filter does not establish entire programme scope · project · 2026-09-04
Kenya’s action and project status
Kenya is reported to have approved this legacy CDM activity’s transition to the UN Paris Agreement Crediting Mechanism. The Kenya approval instrument and its included components have not been read; this is not a verified authorization for Article 6 international use.
- Reported status
- Host-approved CDM transition (UNEP classification) · 2026-09-04. This source date is not necessarily the date of the approval.
- Decision document
- Underlying Kenyan decision not inspected. The tracker’s status is retained; the decision date and exact component scope remain unverified.
- International-use authorization
- Not verified in this review. No inspected instrument establishes the authorized quantity, vintages and uses for this entry.
- Corresponding adjustment
- No project-specific accounting record verified in this review. This is an evidence gap, not a finding that no adjustment exists.
Institutions and their capacity
These are dated roles in the cited mechanism. A historical CDM participant, auditor or funder is not automatically a current Article 6 partner.
| Institution | Capacity | Status and evidence |
|---|---|---|
| Lake Turkana Wind Power Limited | Authorized CDM participant CDM programme or project | Listed in CDM recordRole source Observed 2026-10-01 |
| Carbon Africa Limited | Former authorized CDM participant CDM programme or project | Withdrawn Withdrawn: 2026-06-24 Role sourceObserved 2026-10-01 |
| South Pole Carbon Asset Management Limited | Former authorized CDM participant listed under Switzerland CDM programme or project | Withdrawn Withdrawn: 2024-05-17 Role sourceObserved 2026-10-01 |
Connection to other registries
GS725 retained SGS final validation report explicitly identifies UNFCCC reference4513, same Lake Turkana310MW project.
- Gold Standard · GS725 · View our category record
Documented programme/component or certification link; unit duplication not established
What needs checking next
- Inspect the PACM transition submission: addendum if retaining a CDM methodology, or revised design documents and PACM-accredited DOE validation if adopting a PACM methodology; do not assume the legacy DOE remains appointed.
- Kenya DNA A6.4-FORM-AC-003 transition approval and any annex defining included CPAs
- Formal PACM registration/transition decision and effective date
- Separate international-use authorization, authorized quantity/vintages/use and corresponding-adjustment evidence, if any
- Match specific components and periods before any unit-level or credit deduplication. Identity overlap alone is not duplicate issuance.
Named roles from selected public records; not a complete institutional crawl. A linked activity is not evidence of duplicate issued units.
UNFCCC CDM 6606KTDA Small Hydro Programme of Activities
CDM transition approvedHydropowerKenya-linked; country filter does not establish entire programme scope · programme · 2026-09-04
KTDA Small Hydro Programme of Activities
CDM transition approvedHydropowerKenya-linked; country filter does not establish entire programme scope · programme · 2026-09-04
Kenya’s action and project status
Kenya is reported to have approved this legacy CDM activity’s transition to the UN Paris Agreement Crediting Mechanism. The Kenya approval instrument and its included components have not been read; this is not a verified authorization for Article 6 international use.
- Reported status
- Host-approved CDM transition (UNEP classification) · 2026-09-04. This source date is not necessarily the date of the approval.
- Decision document
- Underlying Kenyan decision not inspected. The tracker’s status is retained; the decision date and exact component scope remain unverified.
- International-use authorization
- Not verified in this review. No inspected instrument establishes the authorized quantity, vintages and uses for this entry.
- Corresponding adjustment
- No project-specific accounting record verified in this review. This is an evidence gap, not a finding that no adjustment exists.
Institutions and their capacity
These are dated roles in the cited mechanism. A historical CDM participant, auditor or funder is not automatically a current Article 6 partner.
| Institution | Capacity | Status and evidence |
|---|---|---|
| KTDA Power Company (KTPC) | Coordinating/managing entity and authorized participant CDM programme or project | Listed in CDM recordRole source Observed 2026-10-01 |
| Swedish Energy Agency | Authorized CDM participant listed under Sweden CDM programme or project | Listed in CDM record Listed participation end: 2026-12-31 Role sourceObserved 2026-10-01 |
| AENOR | DOE on original CDM programme record CDM programme or project | Historical assessmentRole source Observed 2026-10-01 |
| TÜV NORD | DOE on crediting-period renewal record CDM programme or project | Renewal assessment Renewal approved 2 December 2020 for period 14 September 2019–13 September 2026. Role sourceObserved 2026-10-01 |
Connection to other registries
Exact official CDM record is identified. No documentary GS/Verra/PV identity was established after the bounded all-inventory crosswalk. This does not prove the activity is new or has no other registry registration.
No documentary link to a retained voluntary-registry entry established here.
What needs checking next
- Inspect the PACM transition submission: addendum if retaining a CDM methodology, or revised design documents and PACM-accredited DOE validation if adopting a PACM methodology; do not assume the legacy DOE remains appointed.
- Kenya DNA A6.4-FORM-AC-003 transition approval and any annex defining included CPAs
- Formal PACM registration/transition decision and effective date
- Separate international-use authorization, authorized quantity/vintages/use and corresponding-adjustment evidence, if any
- Find explicit voluntary registry IDs for CDM6606 or Gura/North Mathioya/Chania; World Bank operation P160157 is not a carbon registry ID.
Named roles from selected public records; not a complete institutional crawl. A linked activity is not evidence of duplicate issued units.
UNFCCC CDM 7359PoA for the Reduction of emission from non-renewable fuel from cooking at household level
CDM transition approvedCleaner cookingMulticountry programme with Kenyan component activities · programme · 2026-09-04
PoA for the Reduction of emission from non-renewable fuel from cooking at household level
CDM transition approvedCleaner cookingMulticountry programme with Kenyan component activities · programme · 2026-09-04
Kenya’s action and project status
Kenya is reported to have approved this legacy CDM activity’s transition to the UN Paris Agreement Crediting Mechanism. The Kenya approval instrument and its included components have not been read; this is not a verified authorization for Article 6 international use.
- Reported status
- Host-approved CDM transition (UNEP classification) · 2026-09-04. This source date is not necessarily the date of the approval.
- Decision document
- Underlying Kenyan decision not inspected. The tracker’s status is retained; the decision date and exact component scope remain unverified.
- International-use authorization
- Not verified in this review. No inspected instrument establishes the authorized quantity, vintages and uses for this entry.
- Corresponding adjustment
- No project-specific accounting record verified in this review. This is an evidence gap, not a finding that no adjustment exists.
Institutions and their capacity
These are dated roles in the cited mechanism. A historical CDM participant, auditor or funder is not automatically a current Article 6 partner.
| Institution | Capacity | Status and evidence |
|---|---|---|
| Green Development AS | Coordinating/managing entity and authorized participant CDM programme or project | Listed in CDM recordRole source Observed 2026-10-01 |
| LGAI Tech. Center S.A | DOE on CDM renewal record CDM programme or project | Renewal assessment Renewal approved 6 May 2021; not a verified PACM appointment. Role sourceObserved 2026-10-01 |
Connection to other registries
CDM7359 explicitly appears in both GS7569 monitoring documentation and the GS11574 transition form. Three earlier Kenyan GS components and all six newer Kenyan GS components are documented. These are separate programme relationships, not an assertion that their credited units or vintages are identical.
- Gold Standard · GS7569 · View our category record
Documented programme/component or certification link; unit duplication not established - Gold Standard · GS11574 · View our category record
Documented programme/component or certification link; unit duplication not established - Gold Standard · GS7498 · View our category record
Documented programme/component or certification link; unit duplication not established - Gold Standard · GS7504 · View our category record
Documented programme/component or certification link; unit duplication not established - Gold Standard · GS7505 · View our category record
Documented programme/component or certification link; unit duplication not established - Gold Standard · GS11688 · View our category record
Documented programme/component or certification link; unit duplication not established - Gold Standard · GS11689 · View our category record
Documented programme/component or certification link; unit duplication not established - Gold Standard · GS11690 · View our category record
Documented programme/component or certification link; unit duplication not established - Gold Standard · GS11691 · View our category record
Documented programme/component or certification link; unit duplication not established - Gold Standard · GS11692 · View our category record
Documented programme/component or certification link; unit duplication not established - Gold Standard · GS11693 · View our category record
Documented programme/component or certification link; unit duplication not established
What needs checking next
- Inspect the PACM transition submission: addendum if retaining a CDM methodology, or revised design documents and PACM-accredited DOE validation if adopting a PACM methodology; do not assume the legacy DOE remains appointed.
- Kenya DNA A6.4-FORM-AC-003 transition approval and any annex defining included CPAs
- Formal PACM registration/transition decision and effective date
- Separate international-use authorization, authorized quantity/vintages/use and corresponding-adjustment evidence, if any
- Keep older GS7569 and later GS11574 registrations separate; match transition dates and component vintages before any credit comparison.
Named roles from selected public records; not a complete institutional crawl. A linked activity is not evidence of duplicate issued units.
UNFCCC CDM 7997BioLite Improved Cook stoves Programme
CDM transition approvedCleaner cookingKenya-linked; country filter does not establish entire programme scope · programme · 2026-09-04
BioLite Improved Cook stoves Programme
CDM transition approvedCleaner cookingKenya-linked; country filter does not establish entire programme scope · programme · 2026-09-04
Kenya’s action and project status
Kenya is reported to have approved this legacy CDM activity’s transition to the UN Paris Agreement Crediting Mechanism. The Kenya approval instrument and its included components have not been read; this is not a verified authorization for Article 6 international use.
- Reported status
- Host-approved CDM transition (UNEP classification) · 2026-09-04. This source date is not necessarily the date of the approval.
- Decision document
- Underlying Kenyan decision not inspected. The tracker’s status is retained; the decision date and exact component scope remain unverified.
- International-use authorization
- Not verified in this review. No inspected instrument establishes the authorized quantity, vintages and uses for this entry.
- Corresponding adjustment
- No project-specific accounting record verified in this review. This is an evidence gap, not a finding that no adjustment exists.
Institutions and their capacity
These are dated roles in the cited mechanism. A historical CDM participant, auditor or funder is not automatically a current Article 6 partner.
| Institution | Capacity | Status and evidence |
|---|---|---|
| BioLite India Private Limited | Coordinating/managing entity and authorized participant CDM programme or project | Listed in CDM recordRole source Observed 2026-10-01 |
| The Norwegian Ministry of Climate and Environment | Authorized CDM participant listed under Norway CDM programme or project | Listed in CDM recordRole source Observed 2026-10-01 |
| International Carbon Portfolio Ltd | Authorized CDM participant listed under Switzerland CDM programme or project | Listed in CDM record Listed participation end: 2029-09-26 Role sourceObserved 2026-10-01 |
| Carbon Check | DOE on CDM renewal record CDM programme or project | Renewal assessment The original-period page lists BVI. Do not collapse the two assessments into one permanent verifier. Role sourceObserved 2026-10-01 |
Connection to other registries
GS11191 design document explicitly lists CDM/other-standard reference7997 and its exact URL. Components and vintages still need separate unit matching. Supplementary official VCS2982 description explicitly identifies CDM7997 and its exact UNFCCC URL, with CER-conversion scope. This does not assign the multicountry converted volume to Kenya.
- Gold Standard · GS11191 · View our category record
Documented programme/component or certification link; unit duplication not established - Verra VCS · VCS2982
Documented component or CER-conversion relation; unit duplication not established
What needs checking next
- Inspect the PACM transition submission: addendum if retaining a CDM methodology, or revised design documents and PACM-accredited DOE validation if adopting a PACM methodology; do not assume the legacy DOE remains appointed.
- Kenya DNA A6.4-FORM-AC-003 transition approval and any annex defining included CPAs
- Formal PACM registration/transition decision and effective date
- Separate international-use authorization, authorized quantity/vintages/use and corresponding-adjustment evidence, if any
- Match specific components and periods before any unit-level or credit deduplication. Identity overlap alone is not duplicate issuance.
Named roles from selected public records; not a complete institutional crawl. A linked activity is not evidence of duplicate issued units.
UNFCCC CDM 8643Olkaria I Units 4&5 Geothermal Project
CDM transition approvedGeothermalKenya-linked; country filter does not establish entire programme scope · project · 2026-09-04
Olkaria I Units 4&5 Geothermal Project
CDM transition approvedGeothermalKenya-linked; country filter does not establish entire programme scope · project · 2026-09-04
Kenya’s action and project status
Kenya is reported to have approved this legacy CDM activity’s transition to the UN Paris Agreement Crediting Mechanism. The Kenya approval instrument and its included components have not been read; this is not a verified authorization for Article 6 international use.
- Reported status
- Host-approved CDM transition (UNEP classification) · 2026-09-04. This source date is not necessarily the date of the approval.
- Decision document
- Underlying Kenyan decision not inspected. The tracker’s status is retained; the decision date and exact component scope remain unverified.
- International-use authorization
- Not verified in this review. No inspected instrument establishes the authorized quantity, vintages and uses for this entry.
- Corresponding adjustment
- No project-specific accounting record verified in this review. This is an evidence gap, not a finding that no adjustment exists.
Institutions and their capacity
These are dated roles in the cited mechanism. A historical CDM participant, auditor or funder is not automatically a current Article 6 partner.
| Institution | Capacity | Status and evidence |
|---|---|---|
| Kenya Electricity Generating Company Limited | Authorized CDM participant CDM programme or project | Listed in CDM recordRole source Observed 2026-10-01 |
Connection to other registries
Exact official CDM record is identified. No documentary GS/Verra/PV identity was established after the bounded all-inventory crosswalk. This does not prove the activity is new or has no other registry registration.
No documentary link to a retained voluntary-registry entry established here.
What needs checking next
- Inspect the PACM transition submission: addendum if retaining a CDM methodology, or revised design documents and PACM-accredited DOE validation if adopting a PACM methodology; do not assume the legacy DOE remains appointed.
- Kenya DNA A6.4-FORM-AC-003 transition approval and any annex defining included CPAs
- Formal PACM registration/transition decision and effective date
- Separate international-use authorization, authorized quantity/vintages/use and corresponding-adjustment evidence, if any
- No exact voluntary ID established. Olkaria I Units4&5 is distinct from VCS881 Olkaria III Phase2.
Named roles from selected public records; not a complete institutional crawl. A linked activity is not evidence of duplicate issued units.
UNFCCC CDM 8646Olkaria IV Geothermal Project
CDM transition approvedGeothermalKenya-linked; country filter does not establish entire programme scope · project · 2026-09-04
Olkaria IV Geothermal Project
CDM transition approvedGeothermalKenya-linked; country filter does not establish entire programme scope · project · 2026-09-04
Kenya’s action and project status
Kenya is reported to have approved this legacy CDM activity’s transition to the UN Paris Agreement Crediting Mechanism. The Kenya approval instrument and its included components have not been read; this is not a verified authorization for Article 6 international use.
- Reported status
- Host-approved CDM transition (UNEP classification) · 2026-09-04. This source date is not necessarily the date of the approval.
- Decision document
- Underlying Kenyan decision not inspected. The tracker’s status is retained; the decision date and exact component scope remain unverified.
- International-use authorization
- Not verified in this review. No inspected instrument establishes the authorized quantity, vintages and uses for this entry.
- Corresponding adjustment
- No project-specific accounting record verified in this review. This is an evidence gap, not a finding that no adjustment exists.
Institutions and their capacity
These are dated roles in the cited mechanism. A historical CDM participant, auditor or funder is not automatically a current Article 6 partner.
| Institution | Capacity | Status and evidence |
|---|---|---|
| Kenya Electricity Generating Company Limited | Authorized CDM participant CDM programme or project | Listed in CDM recordRole source Observed 2026-10-01 |
Connection to other registries
Exact official CDM record is identified. No documentary GS/Verra/PV identity was established after the bounded all-inventory crosswalk. This does not prove the activity is new or has no other registry registration.
No documentary link to a retained voluntary-registry entry established here.
What needs checking next
- Inspect the PACM transition submission: addendum if retaining a CDM methodology, or revised design documents and PACM-accredited DOE validation if adopting a PACM methodology; do not assume the legacy DOE remains appointed.
- Kenya DNA A6.4-FORM-AC-003 transition approval and any annex defining included CPAs
- Formal PACM registration/transition decision and effective date
- Separate international-use authorization, authorized quantity/vintages/use and corresponding-adjustment evidence, if any
- Already held in September25 CDM ledger. No exact voluntary ID established. Olkaria IV is distinct from VCS881 Olkaria III Phase2.
Named roles from selected public records; not a complete institutional crawl. A linked activity is not evidence of duplicate issued units.
UNFCCC CDM 9164Installation of Energy Efficient Transformers (IEET)
CDM transition approvedGrid/energy supply efficiencyKenya-linked; country filter does not establish entire programme scope · programme · 2026-09-04
Installation of Energy Efficient Transformers (IEET)
CDM transition approvedGrid/energy supply efficiencyKenya-linked; country filter does not establish entire programme scope · programme · 2026-09-04
Kenya’s action and project status
Kenya is reported to have approved this legacy CDM activity’s transition to the UN Paris Agreement Crediting Mechanism. The Kenya approval instrument and its included components have not been read; this is not a verified authorization for Article 6 international use.
- Reported status
- Host-approved CDM transition (UNEP classification) · 2026-09-04. This source date is not necessarily the date of the approval.
- Decision document
- Underlying Kenyan decision not inspected. The tracker’s status is retained; the decision date and exact component scope remain unverified.
- International-use authorization
- Not verified in this review. No inspected instrument establishes the authorized quantity, vintages and uses for this entry.
- Corresponding adjustment
- No project-specific accounting record verified in this review. This is an evidence gap, not a finding that no adjustment exists.
Institutions and their capacity
These are dated roles in the cited mechanism. A historical CDM participant, auditor or funder is not automatically a current Article 6 partner.
| Institution | Capacity | Status and evidence |
|---|---|---|
| Additional Energy Limited | Coordinating/managing entity and authorized participant CDM programme or project | Listed in CDM recordRole source Observed 2026-10-01 |
| Standard Bank Plc | Former authorized CDM participant CDM programme or project | Withdrawn Registry marks participant withdrawn; no withdrawal date assigned here. Role sourceObserved 2026-10-01 |
| JCI | Designated operational entity (DOE) listed for the CDM programme CDM programme or project | Listed in CDM recordRole source Observed 2026-10-01 |
Connection to other registries
Exact official CDM record is identified. No documentary GS/Verra/PV identity was established after the bounded all-inventory crosswalk. This does not prove the activity is new or has no other registry registration.
No documentary link to a retained voluntary-registry entry established here.
What needs checking next
- Inspect the PACM transition submission: addendum if retaining a CDM methodology, or revised design documents and PACM-accredited DOE validation if adopting a PACM methodology; do not assume the legacy DOE remains appointed.
- Kenya DNA A6.4-FORM-AC-003 transition approval and any annex defining included CPAs
- Formal PACM registration/transition decision and effective date
- Separate international-use authorization, authorized quantity/vintages/use and corresponding-adjustment evidence, if any
- Find explicit voluntary ID for CDM9164 or CPA0001 Kenya/KPLC; a Verra methodology page for AM0067 is not a project record.
Named roles from selected public records; not a complete institutional crawl. A linked activity is not evidence of duplicate issued units.
UNFCCC CDM 9265Top Third Ventures Stove Programme
CDM transition approvedCleaner cookingKenya-linked; country filter does not establish entire programme scope · programme · 2026-09-04
Top Third Ventures Stove Programme
CDM transition approvedCleaner cookingKenya-linked; country filter does not establish entire programme scope · programme · 2026-09-04
Kenya’s action and project status
Kenya is reported to have approved this legacy CDM activity’s transition to the UN Paris Agreement Crediting Mechanism. The Kenya approval instrument and its included components have not been read; this is not a verified authorization for Article 6 international use.
- Reported status
- Host-approved CDM transition (UNEP classification) · 2026-09-04. This source date is not necessarily the date of the approval.
- Decision document
- Underlying Kenyan decision not inspected. The tracker’s status is retained; the decision date and exact component scope remain unverified.
- International-use authorization
- Not verified in this review. No inspected instrument establishes the authorized quantity, vintages and uses for this entry.
- Corresponding adjustment
- No project-specific accounting record verified in this review. This is an evidence gap, not a finding that no adjustment exists.
Institutions and their capacity
These are dated roles in the cited mechanism. A historical CDM participant, auditor or funder is not automatically a current Article 6 partner.
| Institution | Capacity | Status and evidence |
|---|---|---|
| BURN Manufacturing Co. | Coordinating/managing entity and authorized participant CDM programme or project | Listed in CDM record Official renewal page retrieved through the web reader is an older indexed view (6 September 2024); current participant list needs a fresh native capture. Role sourceObserved 2026-10-01 |
| Top Third Ventures Limited | Authorized CDM participant CDM programme or project | Listed in CDM record Same older renewal view; role retained historically, not independently confirmed as current. Role sourceObserved 2026-10-01 |
| KBS | DOE on CDM renewal record CDM programme or project | Renewal assessment Renewal approved 15 October 2020. Role sourceObserved 2026-10-01 |
Connection to other registries
GS11607 filed PDD explicitly identifies Top Third Ventures CDM PoA9265.
- Gold Standard · GS11607 · View our category record
Documented programme/component or certification link; unit duplication not established
What needs checking next
- Inspect the PACM transition submission: addendum if retaining a CDM methodology, or revised design documents and PACM-accredited DOE validation if adopting a PACM methodology; do not assume the legacy DOE remains appointed.
- Kenya DNA A6.4-FORM-AC-003 transition approval and any annex defining included CPAs
- Formal PACM registration/transition decision and effective date
- Separate international-use authorization, authorized quantity/vintages/use and corresponding-adjustment evidence, if any
- Match specific components and periods before any unit-level or credit deduplication. Identity overlap alone is not duplicate issuance.
Named roles from selected public records; not a complete institutional crawl. A linked activity is not evidence of duplicate issued units.
UNFCCC CDM 9785Restoration of Degraded Lands through Reforestation in MAU Forest Complex, Kenya
CDM transition approvedReforestation and ecosystem restorationKenya-linked; country filter does not establish entire programme scope · project · 2026-09-04
Restoration of Degraded Lands through Reforestation in MAU Forest Complex, Kenya
CDM transition approvedReforestation and ecosystem restorationKenya-linked; country filter does not establish entire programme scope · project · 2026-09-04
Kenya’s action and project status
Kenya is reported to have approved this legacy CDM activity’s transition to the UN Paris Agreement Crediting Mechanism. The Kenya approval instrument and its included components have not been read; this is not a verified authorization for Article 6 international use.
- Reported status
- Host-approved CDM transition (UNEP classification) · 2026-09-04. This source date is not necessarily the date of the approval.
- Decision document
- Underlying Kenyan decision not inspected. The tracker’s status is retained; the decision date and exact component scope remain unverified.
- International-use authorization
- Not verified in this review. No inspected instrument establishes the authorized quantity, vintages and uses for this entry.
- Corresponding adjustment
- No project-specific accounting record verified in this review. This is an evidence gap, not a finding that no adjustment exists.
Institutions and their capacity
These are dated roles in the cited mechanism. A historical CDM participant, auditor or funder is not automatically a current Article 6 partner.
| Institution | Capacity | Status and evidence |
|---|---|---|
| The National Treasury and Economic Planning | Authorized CDM participant CDM programme or project | Listed in CDM record This registry label does not on its own identify every implementing agency or community institution; forestry implementation roles require the PDD. Role sourceObserved 2026-10-01 |
Connection to other registries
Exact official CDM record is identified. No documentary GS/Verra/PV identity was established after the bounded all-inventory crosswalk. This does not prove the activity is new or has no other registry registration.
No documentary link to a retained voluntary-registry entry established here.
What needs checking next
- Inspect the PACM transition submission: addendum if retaining a CDM methodology, or revised design documents and PACM-accredited DOE validation if adopting a PACM methodology; do not assume the legacy DOE remains appointed.
- Kenya DNA A6.4-FORM-AC-003 transition approval and any annex defining included CPAs
- Formal PACM registration/transition decision and effective date
- Separate international-use authorization, authorized quantity/vintages/use and corresponding-adjustment evidence, if any
- No exact voluntary ID established. Similar forest/geography names cannot establish identity.
Named roles from selected public records; not a complete institutional crawl. A linked activity is not evidence of duplicate issued units.
UNFCCC CDM 9789Restoration of Degraded Lands through Reforestation in Aberdare Forest Complex & National Park area, Kenya
CDM transition approvedReforestation and ecosystem restorationKenya-linked; country filter does not establish entire programme scope · project · 2026-09-04
Restoration of Degraded Lands through Reforestation in Aberdare Forest Complex & National Park area, Kenya
CDM transition approvedReforestation and ecosystem restorationKenya-linked; country filter does not establish entire programme scope · project · 2026-09-04
Kenya’s action and project status
Kenya is reported to have approved this legacy CDM activity’s transition to the UN Paris Agreement Crediting Mechanism. The Kenya approval instrument and its included components have not been read; this is not a verified authorization for Article 6 international use.
- Reported status
- Host-approved CDM transition (UNEP classification) · 2026-09-04. This source date is not necessarily the date of the approval.
- Decision document
- Underlying Kenyan decision not inspected. The tracker’s status is retained; the decision date and exact component scope remain unverified.
- International-use authorization
- Not verified in this review. No inspected instrument establishes the authorized quantity, vintages and uses for this entry.
- Corresponding adjustment
- No project-specific accounting record verified in this review. This is an evidence gap, not a finding that no adjustment exists.
Institutions and their capacity
These are dated roles in the cited mechanism. A historical CDM participant, auditor or funder is not automatically a current Article 6 partner.
| Institution | Capacity | Status and evidence |
|---|---|---|
| The National Treasury and Economic Planning | Authorized CDM participant CDM programme or project | Listed in CDM record This registry label does not on its own identify every implementing agency or community institution; forestry implementation roles require the PDD. Role sourceObserved 2026-10-01 |
Connection to other registries
Exact official CDM record is identified. No documentary GS/Verra/PV identity was established after the bounded all-inventory crosswalk. This does not prove the activity is new or has no other registry registration.
No documentary link to a retained voluntary-registry entry established here.
What needs checking next
- Inspect the PACM transition submission: addendum if retaining a CDM methodology, or revised design documents and PACM-accredited DOE validation if adopting a PACM methodology; do not assume the legacy DOE remains appointed.
- Kenya DNA A6.4-FORM-AC-003 transition approval and any annex defining included CPAs
- Formal PACM registration/transition decision and effective date
- Separate international-use authorization, authorized quantity/vintages/use and corresponding-adjustment evidence, if any
- No exact voluntary ID established. Do not merge with GS883 Aberdares cookstoves or Upper Tana Plan Vivo.
Named roles from selected public records; not a complete institutional crawl. A linked activity is not evidence of duplicate issued units.
UNFCCC CDM 9948Impact Carbon Global Safe Water Programme of Activities (PoA)
CDM transition approvedWater purification and water supplyMulticountry programme with Kenyan component activities · programme · 2026-09-04
Impact Carbon Global Safe Water Programme of Activities (PoA)
CDM transition approvedWater purification and water supplyMulticountry programme with Kenyan component activities · programme · 2026-09-04
Kenya’s action and project status
Kenya is reported to have approved this legacy CDM activity’s transition to the UN Paris Agreement Crediting Mechanism. The Kenya approval instrument and its included components have not been read; this is not a verified authorization for Article 6 international use.
- Reported status
- Host-approved CDM transition (UNEP classification) · 2026-09-04. This source date is not necessarily the date of the approval.
- Decision document
- Underlying Kenyan decision not inspected. The tracker’s status is retained; the decision date and exact component scope remain unverified.
- International-use authorization
- Not verified in this review. No inspected instrument establishes the authorized quantity, vintages and uses for this entry.
- Corresponding adjustment
- No project-specific accounting record verified in this review. This is an evidence gap, not a finding that no adjustment exists.
Institutions and their capacity
These are dated roles in the cited mechanism. A historical CDM participant, auditor or funder is not automatically a current Article 6 partner.
| Institution | Capacity | Status and evidence |
|---|---|---|
| Impact Carbon | Coordinating/managing entity CDM programme or project | Listed in CDM recordRole source Observed 2026-10-01 |
| Carbon Check | DOE for component inclusion CDM programme or project | Historical component assessment 26 April 2019 inclusion; includes CPAs38–47 labelled as supported by Republic of Korea. Support label alone is not an Article6 purchase or authorization. Role sourceObserved 2026-10-01 |
| Earthood | DOE for monitoring-plan deviation assessment CDM programme or project | Historical period assessment PRC-9948-008, approved 19 August 2021, applies to 1 January–21 March 2020; not a standing PACM verifier assignment. Role sourceObserved 2026-10-01 |
Connection to other registries
Official GS deviation record explicitly states that systems for VPAs01–47 transferred from CDMPoA9948. Kenya VPAs31–47 correspond to GS11289–GS11305; programme/period scope is not identical.
- Gold Standard · GS11189 · View our category record
Documented programme/component or certification link; unit duplication not established - Gold Standard · GS11289 · View our category record
Documented programme/component or certification link; unit duplication not established - Gold Standard · GS11290 · View our category record
Documented programme/component or certification link; unit duplication not established - Gold Standard · GS11291 · View our category record
Documented programme/component or certification link; unit duplication not established - Gold Standard · GS11292 · View our category record
Documented programme/component or certification link; unit duplication not established - Gold Standard · GS11293 · View our category record
Documented programme/component or certification link; unit duplication not established - Gold Standard · GS11294 · View our category record
Documented programme/component or certification link; unit duplication not established - Gold Standard · GS11295 · View our category record
Documented programme/component or certification link; unit duplication not established - Gold Standard · GS11296 · View our category record
Documented programme/component or certification link; unit duplication not established - Gold Standard · GS11297 · View our category record
Documented programme/component or certification link; unit duplication not established - Gold Standard · GS11298 · View our category record
Documented programme/component or certification link; unit duplication not established - Gold Standard · GS11299 · View our category record
Documented programme/component or certification link; unit duplication not established - Gold Standard · GS11300 · View our category record
Documented programme/component or certification link; unit duplication not established - Gold Standard · GS11301 · View our category record
Documented programme/component or certification link; unit duplication not established - Gold Standard · GS11302 · View our category record
Documented programme/component or certification link; unit duplication not established - Gold Standard · GS11303 · View our category record
Documented programme/component or certification link; unit duplication not established - Gold Standard · GS11304 · View our category record
Documented programme/component or certification link; unit duplication not established - Gold Standard · GS11305 · View our category record
Documented programme/component or certification link; unit duplication not established
What needs checking next
- Inspect the PACM transition submission: addendum if retaining a CDM methodology, or revised design documents and PACM-accredited DOE validation if adopting a PACM methodology; do not assume the legacy DOE remains appointed.
- Kenya DNA A6.4-FORM-AC-003 transition approval and any annex defining included CPAs
- Formal PACM registration/transition decision and effective date
- Separate international-use authorization, authorized quantity/vintages/use and corresponding-adjustment evidence, if any
- Match specific components and periods before any unit-level or credit deduplication. Identity overlap alone is not duplicate issuance.
Named roles from selected public records; not a complete institutional crawl. A linked activity is not evidence of duplicate issued units.
UNFCCC CDM 99605.1MW Grid Connected Wind Electricity Generation at Ngong Hills, Kenya.
CDM transition approvedWindKenya-linked; country filter does not establish entire programme scope · project · 2026-09-04
5.1MW Grid Connected Wind Electricity Generation at Ngong Hills, Kenya.
CDM transition approvedWindKenya-linked; country filter does not establish entire programme scope · project · 2026-09-04
Kenya’s action and project status
Kenya is reported to have approved this legacy CDM activity’s transition to the UN Paris Agreement Crediting Mechanism. The Kenya approval instrument and its included components have not been read; this is not a verified authorization for Article 6 international use.
- Reported status
- Host-approved CDM transition (UNEP classification) · 2026-09-04. This source date is not necessarily the date of the approval.
- Decision document
- Underlying Kenyan decision not inspected. The tracker’s status is retained; the decision date and exact component scope remain unverified.
- International-use authorization
- Not verified in this review. No inspected instrument establishes the authorized quantity, vintages and uses for this entry.
- Corresponding adjustment
- No project-specific accounting record verified in this review. This is an evidence gap, not a finding that no adjustment exists.
Institutions and their capacity
These are dated roles in the cited mechanism. A historical CDM participant, auditor or funder is not automatically a current Article 6 partner.
| Institution | Capacity | Status and evidence |
|---|---|---|
| Kenya Electricity Generating Company Plc | Authorized CDM participant CDM programme or project | Listed in CDM recordRole source Observed 2026-10-01 |
Connection to other registries
Exact official CDM record is identified. No documentary GS/Verra/PV identity was established after the bounded all-inventory crosswalk. This does not prove the activity is new or has no other registry registration.
No documentary link to a retained voluntary-registry entry established here.
What needs checking next
- Inspect the PACM transition submission: addendum if retaining a CDM methodology, or revised design documents and PACM-accredited DOE validation if adopting a PACM methodology; do not assume the legacy DOE remains appointed.
- Kenya DNA A6.4-FORM-AC-003 transition approval and any annex defining included CPAs
- Formal PACM registration/transition decision and effective date
- Separate international-use authorization, authorized quantity/vintages/use and corresponding-adjustment evidence, if any
- No exact voluntary ID established. Do not substitute Lake Turkana or other Kenyan wind assets.
Named roles from selected public records; not a complete institutional crawl. A linked activity is not evidence of duplicate issued units.
UNFCCC CDM 5962International water purification programme
Registered after transitionWater purification and water supplyMulticountry programme with Kenyan component activities · programme · 2026-09-04
International water purification programme
Registered after transitionWater purification and water supplyMulticountry programme with Kenyan component activities · programme · 2026-09-04
Kenya’s action and project status
The international programme is reported as registered after transition to PACM, corroborated by the official transitioned-CDM-programmes list. Kenya is one host country; the exact Kenyan component scope and approval instrument remain uninspected. The old 2012 CDM date is not the PACM registration date.
- Reported status
- Registered after CDM transition · 2026-09-04. This source date is not necessarily the date of the approval.
- Registration evidence
- International water purification programme appears among CDM PoAs transitioned to Article 6.4; Kenya is one of multiple host countries. The legacy 2012 date is not treated as the PACM registration date.
- Decision document
- Underlying Kenyan decision not inspected. The tracker’s status is retained; the decision date and exact component scope remain unverified.
- International-use authorization
- Not verified in this review. No inspected instrument establishes the authorized quantity, vintages and uses for this entry.
- Corresponding adjustment
- No project-specific accounting record verified in this review. This is an evidence gap, not a finding that no adjustment exists.
Institutions and their capacity
These are dated roles in the cited mechanism. A historical CDM participant, auditor or funder is not automatically a current Article 6 partner.
| Institution | Capacity | Status and evidence |
|---|---|---|
| Pure Water Ltd. | Coordinating/managing entity and authorized CDM participant CDM programme or project | Listed in CDM recordRole source Observed 2026-10-01 |
| KBS | DOE on CDM renewal record CDM programme or project | Renewal assessment Legacy CDM renewal approved 24 September 2019; current PACM roles need their own filing. Role sourceObserved 2026-10-01 |
Connection to other registries
Developer primary document explicitly prints PoA5962 and GS2404 together. Global Berkeley labels GS2404 Uganda, so a Kenya-only filter misses this multicountry parent. The document describes Uganda CPA9/GS5051; it does not establish GS identities for the eleven Kenyan chlorine-dispenser CPAs.
- Gold Standard · GS2404 · identity evidence document
Documented programme/component or certification link; unit duplication not established
What needs checking next
- Inspect the PACM transition submission: addendum if retaining a CDM methodology, or revised design documents and PACM-accredited DOE validation if adopting a PACM methodology; do not assume the legacy DOE remains appointed.
- Kenya DNA A6.4-FORM-AC-003 transition approval and any annex defining included CPAs
- Formal PACM registration/transition decision and effective date
- Separate international-use authorization, authorized quantity/vintages/use and corresponding-adjustment evidence, if any
- Resolve GS counterparts, if any, of the eleven Kenyan CDM5962 CPAs; do not assign Uganda GS5051 to Kenya.
Named roles from selected public records; not a complete institutional crawl. A linked activity is not evidence of duplicate issued units.
E-Mobility Solutions in Kenya
Swiss-linked proposalsElectric vehiclesKenya · project · 2026-09-04
E-Mobility Solutions in Kenya
Swiss-linked proposalsElectric vehiclesKenya · project · 2026-09-04
Kenya’s action and project status
This is a proposed activity under the Kenya–Switzerland cooperation framework. KliK describes it as in development. A signed country agreement is not project-specific approval; no Kenyan or Swiss authorization for this activity was verified in the reviewed sources.
- Reported status
- Proposed · 2026-09-04. This source date is not necessarily the date of the approval.
- Decision document
- Underlying Kenyan decision not inspected. The tracker’s status is retained; the decision date and exact component scope remain unverified.
- International-use authorization
- Not verified in this review. No inspected instrument establishes the authorized quantity, vintages and uses for this entry.
- Corresponding adjustment
- No project-specific accounting record verified in this review. This is an evidence gap, not a finding that no adjustment exists.
Institutions and their capacity
These are dated roles in the cited mechanism. A historical CDM participant, auditor or funder is not automatically a current Article 6 partner.
| Institution | Capacity | Status and evidence |
|---|---|---|
| Roam Electric | Activity owner and electric-motorcycle provider Proposed Kenya–Switzerland Article6.2 activity | Activity in development KliK profile describes electric motorcycles, telemetry and planned ITMO revenues. Benefits and additionality statements remain developer/buyer claims. Role sourceObserved 2026-10-01 |
| KliK Foundation | Publishes and supports the mitigation activity through intended carbon finance Proposed Kenya–Switzerland Article6.2 activity | Activity in development No purchase contract, authorization or transfer instrument was inspected. Role sourceObserved 2026-10-01 |
Connection to other registries
Named Swiss-supported activity is proposed in UNEP4September2026 snapshot; KliK describes it as in development. No project-specific government authorization or voluntary-registry ID established in this audit.
No documentary link to a retained voluntary-registry entry established here.
What needs checking next
- Published Kenyan authorization naming this mitigation activity and its authorized vintages/quantity/use
- Matching Swiss authorization and MADD
- Monitoring/verification reports and government transfer-examination/recognition records if units have moved
- Seek exact project-specific Kenya authorization and any external registry ID; proposed/in-development is not registered, issued, or transferred.
Named roles from selected public records; not a complete institutional crawl. A linked activity is not evidence of duplicate issued units.
Lake Victoria Water Hyacinth Control Activity
Swiss-linked proposalsBioenergyKenya · project · 2026-09-04
Lake Victoria Water Hyacinth Control Activity
Swiss-linked proposalsBioenergyKenya · project · 2026-09-04
Kenya’s action and project status
This is a proposed activity under the Kenya–Switzerland cooperation framework. KliK describes it as in development. A signed country agreement is not project-specific approval; no Kenyan or Swiss authorization for this activity was verified in the reviewed sources.
- Reported status
- Proposed · 2026-09-04. This source date is not necessarily the date of the approval.
- Decision document
- Underlying Kenyan decision not inspected. The tracker’s status is retained; the decision date and exact component scope remain unverified.
- International-use authorization
- Not verified in this review. No inspected instrument establishes the authorized quantity, vintages and uses for this entry.
- Corresponding adjustment
- No project-specific accounting record verified in this review. This is an evidence gap, not a finding that no adjustment exists.
Institutions and their capacity
These are dated roles in the cited mechanism. A historical CDM participant, auditor or funder is not automatically a current Article 6 partner.
| Institution | Capacity | Status and evidence |
|---|---|---|
| Homa Bay Biogas One Limited | Activity owner and Kenyan implementation entity Proposed Kenya–Switzerland Article6.2 activity | Activity in developmentRole source Observed 2026-10-01 |
| Thika Way Investments Limited | Institution associated with the activity’s founders and initiators Activity development | Described by KliK KliK links founders to Thika Way and Homa Bay Biogas One; do not infer ownership shares. Role sourceObserved 2026-10-01 |
| KliK Foundation | Carbon-finance participant described by the activity profile Proposed Kenya–Switzerland Article6.2 activity | Activity in development Expected carbon revenue is not evidence of payment, credit issuance or sovereign approval. Role sourceObserved 2026-10-01 |
| Tom Mboya University | Biogas seminar cooperation listed among proposed co-benefits Activity co-benefits | Described/planned cooperation Profile claim; no agreement or delivered seminar evidence inspected. Role sourceObserved 2026-10-01 |
Connection to other registries
Named Swiss-supported activity is proposed in UNEP4September2026 snapshot; KliK describes it as in development. No project-specific government authorization or voluntary-registry ID established in this audit.
No documentary link to a retained voluntary-registry entry established here.
What needs checking next
- Published Kenyan authorization naming this mitigation activity and its authorized vintages/quantity/use
- Matching Swiss authorization and MADD
- Monitoring/verification reports and government transfer-examination/recognition records if units have moved
- Seek exact project-specific Kenya authorization and any external registry ID; proposed/in-development is not registered, issued, or transferred.
Named roles from selected public records; not a complete institutional crawl. A linked activity is not evidence of duplicate issued units.
Kenya-Japan JCM KE001Electrification of communities using Ultra Low Head Micro Hydro Power Generation system
Historical JCM registrationsHydropowerKenya · project · 2026-09-04
Electrification of communities using Ultra Low Head Micro Hydro Power Generation system
Historical JCM registrationsHydropowerKenya · project · 2026-09-04
Kenya’s action and project status
The Kenya–Japan Joint Committee registered this project under JCM on 27 January 2020. That historical bilateral approval does not establish post-2020 Article6 authorization or a corresponding adjustment.
- Reported status
- Registered · 2026-09-04. This source date is not necessarily the date of the approval.
- Registration evidence
- JCM project registration · 2020-01-27
- Decision document
- Open decision · 2020-01-27
Kenya–Japan Joint Committee expressly consented to register KE001; historical JCM project registration, not evidence of post-2020 Article 6.2 authorization of units. - International-use authorization
- Not verified in this review. No inspected instrument establishes the authorized quantity, vintages and uses for this entry.
- Corresponding adjustment
- No project-specific accounting record verified in this review. This is an evidence gap, not a finding that no adjustment exists.
Institutions and their capacity
These are dated roles in the cited mechanism. A historical CDM participant, auditor or funder is not automatically a current Article 6 partner.
| Institution | Capacity | Status and evidence |
|---|---|---|
| National Irrigation Board | Kenyan project participant Historical Kenya–Japan JCM project | Listed in official JCM project profileRole source Observed 2026-10-01 |
| Mwea Irrigation Water users’ Association | Kenyan project participant Historical Kenya–Japan JCM project | Listed in official JCM project profileRole source Observed 2026-10-01 |
| NTT DATA INSTITUTE OF MANAGEMENT CONSULTING, Inc. | Japanese project participant Historical Kenya–Japan JCM project | Listed in official JCM project profileRole source Observed 2026-10-01 |
| JAG SeabellCo.,Ltd. | Japanese project participant Historical Kenya–Japan JCM project | Listed in official JCM project profileRole source Observed 2026-10-01 |
| Japan Quality Assurance Organization | Third-party entity (TPE) Historical Kenya–Japan JCM project | Listed in official JCM project profileRole source Observed 2026-10-01 |
Connection to other registries
Exact Kenya-Japan JCM project identified and registered; already retained in the Article6 evidence directory. No documentary GS/Verra/PV match established. Historical JCM registration is not proof of a post-2020 Article6 transfer or modern authorization.
No documentary link to a retained voluntary-registry entry established here.
What needs checking next
- Current Kenya and Japan Article 6 authorization covering this activity and post-2020 vintages, if any
- CARP approach/activity identifiers and any first-transfer/corresponding-adjustment record
- If a voluntary-registry overlap is proposed, require an explicit cross-registry ID. Verify modern authorization separately from legacy JCM registration.
Named roles from selected public records; not a complete institutional crawl. A linked activity is not evidence of duplicate issued units.
Kenya-Japan JCM KE002Introduction of Solar PV System at Salt Factory
Historical JCM registrationsSolar energyKenya · project · 2026-09-04
Introduction of Solar PV System at Salt Factory
Historical JCM registrationsSolar energyKenya · project · 2026-09-04
Kenya’s action and project status
The Kenya–Japan Joint Committee registered this project under JCM on 27 January 2020. That historical bilateral approval does not establish post-2020 Article6 authorization or a corresponding adjustment.
- Reported status
- MO issued · 2026-09-04. This source date is not necessarily the date of the approval.
- Registration evidence
- JCM project registration · 2020-01-27
- Decision document
- Open decision · 2020-01-27
Kenya–Japan Joint Committee expressly consented to register KE002; historical JCM project registration, not evidence of post-2020 Article 6.2 authorization of units. - International-use authorization
- Not verified in this review. No inspected instrument establishes the authorized quantity, vintages and uses for this entry.
- Corresponding adjustment
- No project-specific accounting record verified in this review. This is an evidence gap, not a finding that no adjustment exists.
974 historical JCM credits · monitoring 2016-12-14 to 2018-12-31. 486 issued in Kenya on 2021-03-15; 488 in Japan on 2022-02-24. Pre-2021 vintage. Issuance dates after 2020 do not make the underlying vintage post-2020 or establish an Article 6 ITMO transfer. Issuance record
Institutions and their capacity
These are dated roles in the cited mechanism. A historical CDM participant, auditor or funder is not automatically a current Article 6 partner.
| Institution | Capacity | Status and evidence |
|---|---|---|
| Krystalline Salt Limited | Kenyan project participant; factory location Historical Kenya–Japan JCM project | Listed in official JCM project profileRole source Observed 2026-10-01 |
| Pacific Consultants Co., Ltd. | Japanese project participant Historical Kenya–Japan JCM project | Listed in official JCM project profileRole source Observed 2026-10-01 |
| Lloyd’s Register Quality Assurance Limited | Third-party entity (TPE) Historical Kenya–Japan JCM project | Listed in official JCM project profileRole source Observed 2026-10-01 |
Connection to other registries
Exact Kenya-Japan JCM project identified and registered; already retained in the Article6 evidence directory. No documentary GS/Verra/PV match established. Historical JCM registration is not proof of a post-2020 Article6 transfer or modern authorization.
No documentary link to a retained voluntary-registry entry established here.
What needs checking next
- Current Kenya and Japan Article 6 authorization covering this activity and post-2020 vintages, if any
- CARP approach/activity identifiers and any first-transfer/corresponding-adjustment record
- If a voluntary-registry overlap is proposed, require an explicit cross-registry ID. Verify modern authorization separately from legacy JCM registration.
Named roles from selected public records; not a complete institutional crawl. A linked activity is not evidence of duplicate issued units.
Where does The Nature Conservancy fit?
No project-specific TNC role has been established for these 21 entries in this review. Separately documented Kenyan work includes:
- Upper Tana–Nairobi Water Fund: TNC helped establish the water fund; the fund coordinates its Plan Vivo carbon project.
- Eldoret–Iten Water Fund: ELDOWAS leads, with TNC as a technical partner in the Plan Vivo pipeline proposal.
- Laikipia Conservancies Association: TNC’s accelerator supported feasibility work. That does not establish that it is KN RCP 4714.
- Northern Kenya grasslands: TNC describes support for the NRT programme associated with VCS 1468; this does not itself establish Article 6 authorization.
Technical support, funding, certification and government authorization are separate relationships.
Coverage and unresolved evidence
- Status labels retain 4 September 2026 UNEP observation dates; a current retrieval does not make those underlying statuses current.
- Host-country CDM approval and authorized CDM participants are not Paris international-use authorization.
- Most CDM direct-download checks returned HTTP200 access-challenge stubs, not genuine record pages. Successful web-reader evidence has no locally retained official byte hash.
- Participant lists and DOE assignments are stage/period-specific. Withdrawn actors are retained as historical.
Neither an authorization count of zero inspected instruments nor a tracker’s zero reported transfers proves that Kenya has never authorized or transferred credits. This is a dated research set, not a live national census.