Project proponent: Clean Air Action Corporation

TIST Program in Kenya, VCS 001

Loading selected images…

Issued61,903VCUs recorded
Retired61,853VCUs recorded
Active holdings50VCUs recorded
Institutions10reviewed cards
Documents35current Registry listings

Open this project's map and codebook editor →

VCS 594 · 10 codebook topics

What do the records establish?

These answers remain open to review. The source, its role and the remaining evidence gap stay beside each answer.

V1

Recipient benefit events

Review each event

VCS 594 filings describe live-tree advances, a 70% revenue or profit term, tree products, training and livelihood gains for members, but every promised, paid and verified benefit must remain a separate event.

Link to this topic →
“Ultimately, the Small Groups will receive 70% of the net carbon revenues.”

Project design claim2011 VCS project description · p. 27

V2

Agreement visibility

Two versions located

Official 2005 and 2008 TIST agreement templates are publicly inspectable and materially different, while validators and verifiers reviewed sampled executed contracts.

Link to this topic →
“Two versions of the GhG contract are provided. The one designated 050418 was the first version used in Kenya. It was superseded in 2008 with the one designated 080428. Both remain operational.”

Project-file reference to an instrument2011 VCS risk analysis · p. 3

V3

Consent and authorization

Individual member

VCS 594 reports pre-signing training and voluntary entry, and AENOR cross-checked sampled members’ contracts with each interviewed signatory, supporting a verifier-accepted sampled consent process for individual members within Small Groups.

Link to this topic →
“The farmers only sign the contract and join if they choose to.”

Project-reported consent statement2020 CCB monitoring report · p. 31

V4

Grievance access and remedy

Route + use

The 20 January 2017 programme policy names Leadership Council → TIST Management → agreed mediator → arbitration, while the 22 May 2020 CCB-001 monitoring report, including VCS 594, names Kenya Staff → TIST Management → arbitration; AENOR’s 2021 CCB report repeats the shorter route and confirms interviewed members and staff knew the procedure.

Link to this topic →
“Unresolved issues will be presented to TIST Management.”

Independent assurance account of the route2021 CCB verification report · p. 19

V5

Realized benefit delivery

Derived after V1

A verifier reports US$420,930 paid to all TIST Kenya members during the monitoring period, but that programme-level total cannot become VCS 594 recipient-level delivery without an approved V1 event and a project-bound payment trail.

Link to this topic →
“payment of $420,930 to all TIST Kenya members due to carbon revenues”

Independent assurance, wider TIST Kenya scope2021 CCB verification report · p. 15

V6

SDG claim to delivery

Derived after V1

The 2020 monitoring report maps project activities to named SDGs, but V6 remains ungenerated until each SDG claim is linked to an approved benefit event and claim-specific delivery evidence.

Link to this topic →
“No Poverty: TIST has provided cash income from carbon credits.”

Project-reported SDG claim2020 VCS monitoring report · p. 6

V7

Language and comprehension

Channels + sampled check

TIST used the named Mazingira Bora newsletter, Cluster meetings and local-language translation; a community leader reported six languages, and AENOR independently verified sampled members received understandable translated information and knew the project’s risks and benefits.

Link to this topic →
“It is published in 6 languages, enabling many people to understand it.”

Independent report quoting a community leader2016 CCB verification report · p. 69

V8

Decision power

Two domains separated

VCS 594 members decide where, what species and how many trees to plant and which programmes to adopt, while Small Groups decide internal product and revenue division; separately, they grant TIST carbon rights to CAAC.

Link to this topic →
“They determine how tree products and carbon revenues are divided among themselves.”

Project design account of authority2011 VCS project description · p. 64

V9

Voucher and correction route

Background only

TIST describes farmer-visible quantification, server-generated vouchers, members signing vouchers and receiving money, and a Quantifier route for disputed counts, and AENOR accepted sampled monitoring, contract and voucher records.

Link to this topic →
“If they don’t agree, they can work with the Quantifier ... to reconcile the difference.”

Project-reported voucher and correction route2020 CCB monitoring report · p. 25

V10

Governance authority

Background only

Small Groups manage their trees and contract with CAAC, Clusters coordinate locally, and CAAC manages the GHG component; this authority map supplies context without converting governance structure into a positive participation finding.

Link to this topic →
“They contract with Clean Air Action Corporation (CAAC) to sell their carbon, receive payments, and receive training.”

Project-reported governance structure2020 CCB monitoring report · p. 31

People, source coverage and review stages
Registry rows
35
34 unique byte sets
Physical PDF pages
732
counted by Registry row
Target pages close-read
180
not an all-page human-read claim
Pages visually checked
18
rendered source pages
Bounded findings
12
owner-adjudicatable

These counts describe the held 35-row Registry inventory and the incorporated pilot review. The packet records no review-incorporation date; these figures do not establish coverage of the continuing file crawl.

Do not collapse the actors

Distributed through Clusters. Decided at different levels.

01Rights-holder

Individual farmer / member

Consent, understanding, authorization, withdrawal and remedy are assessed here.

02Contract unit

Small Group

The GHG agreement, tree ownership and allocation terms are described here.

03Delivery layer

Cluster + Quantifier

Training, meetings, vouchers, corrections and monitoring travel through this layer.

04Project side

CAAC / TIST

Project claims, data control, carbon rights, sales and reporting sit here.

Human review Visibility dependency Derived after V1 Background only
V4 · grievance, appeal and remedy

Grievance routes

Two source accounts are shown separately. The 2020 VCS 594 monitoring report gives a short filed route; the 2017 TIST policy gives a longer programme route. Neither is a public outcomes ledger.

VCS 594 monitoring filing · 2020

Project-reported short route

Open p. 25 ↗
  1. 01

    Member raises issue

    A project participant brings a grievance into the disclosed process.

  2. 02

    Kenya Staff

    First point named in the 2020 monitoring report.

  3. 03

    TIST Management

    Unresolved issues are presented to management.

  4. 04

    External arbitration via CAAC

    CAAC submits an unresolved issue to external arbitration; CAAC is not the arbitrator.

Programme policy · 20 Jan 2017

Published escalation route

Open policy ↗
  1. 01

    Member or worker

    A formal complaint enters the TIST procedure.

  2. 02

    Leadership Council

    Reviews the issue against policy, values and the Small Group–CAAC agreement.

    Answer due within 30 days
  3. 03

    TIST Management

    Applies precedent or policy and returns a management response.

    Response due within 30 days
  4. 04

    Agreed mediator

    CAAC and the aggrieved party jointly select an external neutral.

  5. 05

    Arbitration

    Chartered Institute of Arbitrators, Kenya Branch.

    Within 30 days after mediation closes
Operating correction · separate lane

Count or voucher issue → Quantifier → Cluster meeting → correction

Routine reconciliation is not silently converted into a formal grievance or proof of remedy.

Missing public return loop

Decision → remedy → implementation → closure notice ⇢ participant

No complete public VCS 594 complaint register or closure ledger establishes use, outcome, remedy, accessibility or non-retaliation.

Owner-locked instrument · no composite score

One project. Five human lanes. Ten questions.

The locked human order is V1 → V3 → V4 → V7 → V8. V2, V5 and V6 depend on approved upstream links; V9 and V10 run in the background with zero automatic findings.

70projects
1,130benefit events
1,965evidence receipts
0final codes
V1Active · one Benefit Event at a time

Recipient benefits event census

Who was promised or received what benefit, in what quantity or value, during what period, at what stage, and with what claim-specific evidence and assurance scope?

V1 is the active recipient-benefit census. Event stages and owner notes never become a second module automatically.

Boundary and dependencies

Stop rule: Recipient, item, quantity or value, period, stage, exact-project scope and VVB procedure remain atomic; programme context, samples and populations are never silently generalized or added.

Requires: EXACT_BENEFIT_EVENT · EXACT_SOURCE_RECEIPT · HUMAN_REVIEW

V2Dependent · seed after V3

Community agreement visibility

Is an identified agreement, community party and at least one substantive community-facing term publicly visible, and in which public-source lane?

V3 identifies what may have been agreed. V2 separately checks whether an agreement, parties, and substantive terms are publicly visible.

Boundary and dependencies

Stop rule: V3 identifies what may have been agreed; it does not prove that an agreement or its terms are public. A missing public CDA is a visibility state, not proof that no agreement exists.

Requires: HUMAN_APPROVED_V3_EVIDENCE · SOURCE_ATLAS · LIFECYCLE · SEPARATE_VISIBILITY_REVIEW

V3Ready · consent review pages

Consent and authorization process

Which affected rights-holders received what information, through which language and channel, before what decision, and what consultation, consent or authorization outcome is actually documented?

The all-70 V3 queue is ready. Information, consultation, consent, and authorization remain distinct and require human reading.

Boundary and dependencies

Stop rule: Information, consultation, consent and authorization are distinct. Consultation is not consent; a CDA is evidence relevant to consent, not proof of valid consent; silence is not absence or approval.

Requires: EXACT_PROJECT_SOURCE_PAGE · EVENT_TYPE_SEPARATION · TIMING_AND_ACCESS_REVIEW · HUMAN_REVIEW

V4Ready · route, use, remedy

Question, grievance and remedy route

Is an accessible route visible, was it used, and is any resulting remedy linked to that route?

Review route availability, documented use, and route-linked remedy separately. A repair alone is not a grievance route.

Boundary and dependencies

Stop rule: Route availability, documented use and route-linked remedy remain separate; a repair, payment or compensation episode alone does not prove a grievance route.

Requires: EXACT_PROJECT_SOURCE_PAGE · ROUTE_USE_REMEDY_SEPARATION · HUMAN_REVIEW

V5Derived · after approved V1 links

Realized benefit delivery view

What is the highest receipt-backed realized stage for each V1 benefit event, with what claim-specific assurance?

V5 displays the highest receipt-backed realized stage. It never asks the owner to recode the same benefit.

Boundary and dependencies

Stop rule: V5 receives no second benefit code. Realized revenue, sale, price, payer and cash path belong in the separate Money spine and are not inferred from delivery or a VVB document label.

Requires: HUMAN_APPROVED_V1_EVENT · CLAIM_SPECIFIC_ASSURANCE

V6Derived · SDG links and relevant audit

SDG claim-to-delivery view

Which explicit SDG claim links to which V1 intervention and evidence stage, and what did the latest relevant, period-matched independent review actually do with that claim?

V6 derives from explicit SDG claims and approved V1 links. The newest document is not automatically the relevant audit.

Boundary and dependencies

Stop rule: The newest report is not automatically the relevant audit. An SDG label is not delivery, and a VVB report does not automatically approve every SDG or benefit claim.

Requires: EXPLICIT_SDG_CLAIM · HUMAN_APPROVED_V1_LINK · LATEST_RELEVANT_PERIOD_MATCHED_AUDIT

V7Ready · delivery, comprehension

Community-facing language and communication

Was substantive project information actually delivered to a named audience through a named language and channel, and is comprehension separately evidenced?

Named-language delivery and recipient comprehension remain separate observations.

Boundary and dependencies

Stop rule: Generic accessibility is not a delivered artifact; translation or delivery is not comprehension.

Requires: EXACT_PROJECT_SOURCE_PAGE · NAMED_LANGUAGE_DELIVERY · COMPREHENSION_SEPARATION · HUMAN_REVIEW

V8Ready · decision power

Decision power and representation

Do women, young people or affected community groups hold participation or binding representation within a named decision body and authority domain?

Authority and representation remain distinct from attendance, employment, training, targeting, and outcomes in V1.

Boundary and dependencies

Stop rule: Attendance, outreach, employment, training, targeting and gender-differentiated outcomes do not establish decision authority; those outcome lanes remain in V1.

Requires: EXACT_PROJECT_SOURCE_PAGE · DECISION_BODY_AND_AUTHORITY · OUTCOME_SEPARATION · HUMAN_REVIEW

V9Background · source queue active

Monitoring apparatus and claim-linked triangulation

How is a benefit indicator defined and monitored, and what independent or external evidence corroborates, limits or contradicts the exact linked V1 claim?

The source queue is ready, but it contains zero indicator, monitoring-round, event-link, or assurance findings.

Boundary and dependencies

Stop rule: A V1 event alone cannot instantiate V9; external is not automatically independent; search absence is not evidence absence; V1 values, recipients, stages and periods are linked but not copied into V9.

Requires: SOURCE_GROUNDED_MONITORING_PASSAGE · EXPLICIT_V1_EVENT_LINK · CLAIM_SPECIFIC_ASSURANCE_REVIEW

V10Background · case-first governance read

Governance authority and accountability

Which dated body holds what authority, through what composition, selection and decision procedure, with what community voice and accountability?

Institutions route evidence; they do not prove mandate, currentness, community power, or downward accountability.

Boundary and dependencies

Stop rule: Institution identity and project role route evidence but do not prove mandate, currentness, downward accountability or community power. Bodies are never merged across time without evidence.

Requires: DATED_BODY_IDENTITY · PROJECT_ROLE_RECEIPT · DEEP_DOCUMENT_REVIEW · NO_NAME_TO_AUTHORITY_INFERENCE