Kenya · across registries

Count the projects.
Trace what follows.

Start with the catalogued project population, identify historical issuance evidence and check the issued product, then follow the evidence for their methods, institutions, rights and benefits.

Cross-registry research ·

Projects, and the evidence behind them.

441

Projects in this snapshot

Source-defined standalone projects and independently defined programme components. Cross-registry uniqueness and complete national coverage remain under review.

164

Projects with crediting evidence

Historical project-level evidence, with CER labelling distinguished from original issuance. This is not a credit total or proof of benefit receipt.

497 registry filings support this catalogue. A filing is a source record, not automatically another project.

Separate dated research views. The figures above are the 15 October 2026 catalogue. The 7 November 2026 activity/project frame below has a different scope; it is not a measured change in Kenya’s total. Search the project and file index or check source coordination.

The 7 November working reconciliation identifies 3,891 unique file hashes; a file can be linked to more than one project. A file listing or a stored copy shows what has been identified or held. Reading receipts describe the pages or passages reviewed; acceptance and current assignment are separate records. A missing receipt does not mean a file is unread.

A project can have several filings.

A source-defined standalone project or an independently defined programme component. Several filings can describe one project; sharing a developer, programme or method does not by itself merge separately defined projects.

The 497 filings are source records supporting the project population. They are not another set of projects to add to it.

Issuance evidence needs a product match.

At least one direct historical project-level crediting evidence link under its typed category, including own GS-issued CER labelling without a second original issuance claim. Not a current eligibility classification, national issuer census or reconciled credit total.

The roster carries 74 accepted original-credit-positive project links, 8 historical project-stage witnesses, 17 own VCU witnesses, 62 own VER witnesses and 3 GS-labelled CER witnesses. Labelling a CER does not create a second original credit.

Benefits need a further trace.

Credit issuance is a useful point at which to ask what was promised and delivered. It does not establish who received a payment or service, or what a verification body actually assured.

A project’s entitlement, allocation, transfer and recipient receipt each need their own evidence.

The historical crediting roster has expanded: 82 → 99 → 161 → 164. Existing project identities gained 17 own Verra VCU witnesses, then 62 own Gold Standard VER witnesses and three separately labelled CER witnesses. Verra contributes 31 projects. The separate 15 October 2026 catalogue snapshot contains 441 projects supported by 497 filings. These updates do not add credit quantities or certify benefit receipt. Read the dated evidence and source segments.

Umbrella programmes and their activities. Gold Standard calls an umbrella a Programme of Activity (PoA), and each component a Voluntary Project Activity (VPA). A separately defined VPA can count as a project here; its parent is not added again above it. Sharing a parent does not establish identical method editions, separate companies, individual issuance or benefit receipt. Gold Standard definitions ↗

Issuance evidence · projection dated 15 October 2026

Confirmed, collective, or still unresolved.

The roster contains projects with direct historical crediting evidence, including three explicitly identified GS-labelled CER cases. It is not a count of 164 original issuers. Lack of an individual evidence link does not establish that a project has never issued credits.

Historical project crediting
164

Project-level evidence, including three CER labelling witnesses. All are in the searchable roster below.

Collective evidence only
11

Programme or collective evidence is carried; individual component issuance remains unknown.

Unresolved or not yet indexed
266

A project-level issuance disposition is not established here. These are not labelled unissued.

The 164-project study roster by programme / crediting-evidence group
Programme / crediting-evidence groupProjects
Gold Standard only123
Kenya–Japan JCM1
Verra VCS31
CDM only4
Puro.earth1
CDM + Gold Standard1
CDM CER / Gold Standard labelling evidence3
Counted once overall164

These groups count each study project once. They are not seven original issuing registries: the CER labelling group carries original CDM context, and a second filing does not by itself establish a second original issuance. National completeness remains under review.

The historical project-crediting study roster

One project. Five evidence questions.

Search the 164 projects by name, native registry ID or activity type, and switch the evidence subject. Each project keeps its own filing keys, even where programmes, developers or methods are shared.

Documentary context is a starting point. 105 projects carry historical method references; 59 remain unresolved. Selected benefit context is available for 9 projects and shared context for 8. This projection does not convert either into a completed benefit-chain audit. “Not yet audited” means the specified evidence has not been established here.

The shared CDM / Gold Standard project appears in both programme filters and once in All. Filter totals can overlap. CER labelling is shown separately and does not establish another original issuing registry.

Methods & SDGs

A named method is a starting reference. Its applied edition, period and SDG claims need their own evidence.

1–12 of 164 matching projects

Issued-project research population: Methods & SDGs. Documentary context is separate from a completed evidence audit.
Project & evidence basisMethods & SDGs
Gold StandardConfirmed historical issuance · project level

Aqua Clara Water Filtration Program in Kenya

GS:GS1078

Historical issuance evidence

safe water and water efficiency

Issuance evidence basis

Accepted original-credit-positive project link

Historical project issuance evidence is separate from current operation, retirement, benefit delivery, recipient acknowledgment, VVB assurance and physical CO2 measurement.

Current operating or cancellation status: not established here.

Directory context & crawl scope

An entry/reference/context is directory coverage. It is not a completed file-by-file crawl or eight completed maps.

Whole-project crawl complete: not established by this projection.

All subject audits complete: not established by this projection.

Operations / monitoring context: Reference or definition only.

A method, category, definition or gap reference exists. It does not establish this project’s operating practice or benefit chain.

Historical named method reference
  • TPDDTEC
    Reference scope & method link

    Source role: HISTORICAL_METHOD_REFERENCE_ONLY_NOT_APPLIED_VERSION

    Reference status: OWN_ACCEPTED_DERIVED_SOURCE_ASSERTION_REUSED_NOT_CURRENT_APPLICABILITY_CERTIFIED

    Application review: Not established by this reference.

  • TPDDTEC · version 1.0
    Reference scope & method link

    Source role: R18_ACCEPTED_OWN_LITERAL_CONTEXT

    Reference status: EXISTING_REFERENCE_LITERAL_VERSION_FILL

    Application review: Not established by this reference.

Applied edition & period
Not yet audited
Project SDG claims
Not yet audited
Verified SDG contribution
Not yet audited

Literal method IDs, titles and versions retain their source roles. No generic registry norm or method reference proves this project’s current compliance or delivered SDGs.

Gold StandardConfirmed historical issuance · project level

GS2504 - Voluntary Gold Standard multi-country improved cookstove PoA - Oserian Flower Farm Offset Project 1 - Inkoirienito and Oltepesi

GS:GS1248

Historical issuance evidence

clean cooking and heat

Issuance evidence basis

Accepted original-credit-positive project link

Historical project issuance evidence is separate from current operation, retirement, benefit delivery, recipient acknowledgment, VVB assurance and physical CO2 measurement.

Current operating or cancellation status: not established here.

Directory context & crawl scope

An entry/reference/context is directory coverage. It is not a completed file-by-file crawl or eight completed maps.

Whole-project crawl complete: not established by this projection.

All subject audits complete: not established by this projection.

Operations / monitoring context: Reference or definition only.

A method, category, definition or gap reference exists. It does not establish this project’s operating practice or benefit chain.

Historical named method reference
Applied edition & period
Not yet audited
Project SDG claims
Not yet audited
Verified SDG contribution
Not yet audited

Literal method IDs, titles and versions retain their source roles. No generic registry norm or method reference proves this project’s current compliance or delivered SDGs.

Gold StandardConfirmed historical issuance · project level

GS12877 VPA 1- eWATER Emission Reductions from Safe Drinking Water Supply and Accreditation of Water Benefit Certificates - Real case VPA Kenya

GS:GS12933

Historical issuance evidence

Matched native product: issuance 605565 is a Verified Emission Reduction (VER). Separate issuance 605566 is a Water Benefit Certificate (WBC), excluded from carbon-credit accounting. Applicable requirements edition and selected-SDG product attribution remain open.

safe water and water efficiency

Issuance evidence basis

Accepted original-credit-positive project link

Historical project issuance evidence is separate from current operation, retirement, benefit delivery, recipient acknowledgment, VVB assurance and physical CO2 measurement. Atlas matched the selected native VER event 605565 to its already accepted carbon link and separately excluded WBC event 605566. All prior edition, VVB, scientific and programme/SDG qualifications remain; this is event-specific correspondence, not a complete lifetime product history.

Current operating or cancellation status: not established here.

Directory context & crawl scope

An entry/reference/context is directory coverage. It is not a completed file-by-file crawl or eight completed maps.

Whole-project crawl complete: not established by this projection.

All subject audits complete: not established by this projection.

Operations / monitoring context: Reference or definition only.

A method, category, definition or gap reference exists. It does not establish this project’s operating practice or benefit chain.

Historical named method reference
Applied edition & period
Not yet audited
Project SDG claims
Not yet audited
Verified SDG contribution
Not yet audited

Literal method IDs, titles and versions retain their source roles. No generic registry norm or method reference proves this project’s current compliance or delivered SDGs.

Gold StandardConfirmed historical issuance · project level

Improved Jikos - Better Living for Rural Population

GS:GS2457

Historical issuance evidence
Issuance evidence basis

Accepted original-credit-positive project link

Historical project issuance evidence is separate from current operation, retirement, benefit delivery, recipient acknowledgment, VVB assurance and physical CO2 measurement.

Current operating or cancellation status: not established here.

Directory context & crawl scope

An entry/reference/context is directory coverage. It is not a completed file-by-file crawl or eight completed maps.

Whole-project crawl complete: not established by this projection.

All subject audits complete: not established by this projection.

Operations / monitoring context: Reference or definition only.

A method, category, definition or gap reference exists. It does not establish this project’s operating practice or benefit chain.

Historical named method reference
  • TPDDTEC
    Reference scope & method link

    Source role: qualified_ROOT_accepted_own_historical_typed_source_edition_method_assertion

    Reference status: OWN_DATED_METHOD_SELECTION_NOT_CURRENT_ALL_PERIOD_APPLICATION_ASSURANCE

    Application review: Not established by this reference.

  • TPDDTEC · version 3.1
    Reference scope & method link

    Source role: R18_ACCEPTED_OWN_LITERAL_CONTEXT

    Reference status: EXISTING_REFERENCE_LITERAL_VERSION_FILL

    Application review: Not established by this reference.

Applied edition & period
Not yet audited
Project SDG claims
Not yet audited
Verified SDG contribution
Not yet audited

Literal method IDs, titles and versions retain their source roles. No generic registry norm or method reference proves this project’s current compliance or delivered SDGs.

Gold StandardConfirmed historical issuance · project level

GS2504 - Voluntary Gold Standard multi-country improved cookstove PoA - Oserian Flower Farm Offset Project 4 - Ngondi

GS:GS3023

Historical issuance evidence

clean cooking and heat

Issuance evidence basis

Accepted original-credit-positive project link

Historical project issuance evidence is separate from current operation, retirement, benefit delivery, recipient acknowledgment, VVB assurance and physical CO2 measurement.

Current operating or cancellation status: not established here.

Directory context & crawl scope

An entry/reference/context is directory coverage. It is not a completed file-by-file crawl or eight completed maps.

Whole-project crawl complete: not established by this projection.

All subject audits complete: not established by this projection.

Operations / monitoring context: Reference or definition only.

A method, category, definition or gap reference exists. It does not establish this project’s operating practice or benefit chain.

Historical named method reference
Applied edition & period
Not yet audited
Project SDG claims
Not yet audited
Verified SDG contribution
Not yet audited

Literal method IDs, titles and versions retain their source roles. No generic registry norm or method reference proves this project’s current compliance or delivered SDGs.

Gold StandardConfirmed historical issuance · project level

GS1366 Micro Energy PoA, VPA 3 Wema Improved Cookstoves, Kenya

GS:GS3079

Historical issuance evidence

clean cooking and heat

Issuance evidence basis

Accepted original-credit-positive project link

Historical project issuance evidence is separate from current operation, retirement, benefit delivery, recipient acknowledgment, VVB assurance and physical CO2 measurement.

Current operating or cancellation status: not established here.

Directory context & crawl scope

An entry/reference/context is directory coverage. It is not a completed file-by-file crawl or eight completed maps.

Whole-project crawl complete: not established by this projection.

All subject audits complete: not established by this projection.

Operations / monitoring context: Reference or definition only.

A method, category, definition or gap reference exists. It does not establish this project’s operating practice or benefit chain.

Historical named method reference
Applied edition & period
Not yet audited
Project SDG claims
Not yet audited
Verified SDG contribution
Not yet audited

Literal method IDs, titles and versions retain their source roles. No generic registry norm or method reference proves this project’s current compliance or delivered SDGs.

Gold StandardConfirmed historical issuance · project level

GS1366 Micro Energy PoA, VPA 4 Mogotio Improved Cookstoves, Kenya

GS:GS3080

Historical issuance evidence

clean cooking and heat

Issuance evidence basis

Accepted original-credit-positive project link

Historical project issuance evidence is separate from current operation, retirement, benefit delivery, recipient acknowledgment, VVB assurance and physical CO2 measurement.

Current operating or cancellation status: not established here.

Directory context & crawl scope

An entry/reference/context is directory coverage. It is not a completed file-by-file crawl or eight completed maps.

Whole-project crawl complete: not established by this projection.

All subject audits complete: not established by this projection.

Operations / monitoring context: Reference or definition only.

A method, category, definition or gap reference exists. It does not establish this project’s operating practice or benefit chain.

Historical named method reference
Applied edition & period
Not yet audited
Project SDG claims
Not yet audited
Verified SDG contribution
Not yet audited

Literal method IDs, titles and versions retain their source roles. No generic registry norm or method reference proves this project’s current compliance or delivered SDGs.

Gold StandardConfirmed historical issuance · project level

GS2504 Voluntary Gold Standard Multi-country Improved Cookstove PoA-Flamingo Cookstove Project VPA5

GS:GS5780

Historical issuance evidence

clean cooking and heat

Issuance evidence basis

Accepted original-credit-positive project link

Historical project issuance evidence is separate from current operation, retirement, benefit delivery, recipient acknowledgment, VVB assurance and physical CO2 measurement.

Current operating or cancellation status: not established here.

Directory context & crawl scope

An entry/reference/context is directory coverage. It is not a completed file-by-file crawl or eight completed maps.

Whole-project crawl complete: not established by this projection.

All subject audits complete: not established by this projection.

Operations / monitoring context: Reference or definition only.

A method, category, definition or gap reference exists. It does not establish this project’s operating practice or benefit chain.

Historical named method reference
Applied edition & period
Not yet audited
Project SDG claims
Not yet audited
Verified SDG contribution
Not yet audited

Literal method IDs, titles and versions retain their source roles. No generic registry norm or method reference proves this project’s current compliance or delivered SDGs.

Gold StandardConfirmed historical issuance · project level

Multi-Layer Household Water Filtration System in Kenya

GS:GS11207

Historical issuance evidence

safe water and water efficiency

Issuance evidence basis

Accepted original-credit-positive project link

Historical project issuance evidence is separate from current operation, retirement, benefit delivery, recipient acknowledgment, VVB assurance and physical CO2 measurement.

Current operating or cancellation status: not established here.

Directory context & crawl scope

An entry/reference/context is directory coverage. It is not a completed file-by-file crawl or eight completed maps.

Whole-project crawl complete: not established by this projection.

All subject audits complete: not established by this projection.

Operations / monitoring context: Reference or definition only.

A method, category, definition or gap reference exists. It does not establish this project’s operating practice or benefit chain.

Historical named method reference
  • GS Methodology for emission reductions from safe drinking water supplyGS Methodology for emission reductions from safe drinking water supply
    Reference scope & method link

    Source role: native_registry_method_label_in_dated_API_project_record

    Reference status: OWN_DATED_NATIVE_API_METHOD_FIELD_NOT_PROJECT_BODY_APPROVAL_OR_OPERATIVE_PERIOD

    Application review: Not established by this reference.

Applied edition & period
Not yet audited
Project SDG claims
Not yet audited
Verified SDG contribution
Not yet audited

Literal method IDs, titles and versions retain their source roles. No generic registry norm or method reference proves this project’s current compliance or delivered SDGs.

Gold StandardConfirmed historical issuance · project level

Safe Water Programme – Kenya – VPA 31

GS:GS11289

Historical issuance evidence
Issuance evidence basis

Accepted original-credit-positive project link

Historical project issuance evidence is separate from current operation, retirement, benefit delivery, recipient acknowledgment, VVB assurance and physical CO2 measurement.

Current operating or cancellation status: not established here.

Directory context & crawl scope

An entry/reference/context is directory coverage. It is not a completed file-by-file crawl or eight completed maps.

Whole-project crawl complete: not established by this projection.

All subject audits complete: not established by this projection.

Operations / monitoring context: Reference or definition only.

A method, category, definition or gap reference exists. It does not establish this project’s operating practice or benefit chain.

Historical named method reference
Applied edition & period
Not yet audited
Project SDG claims
Not yet audited
Verified SDG contribution
Not yet audited

Literal method IDs, titles and versions retain their source roles. No generic registry norm or method reference proves this project’s current compliance or delivered SDGs.

Gold StandardConfirmed historical issuance · project level

Safe Water Programme – Kenya – VPA 32

GS:GS11290

Historical issuance evidence

Institutional chlorination safe water

Issuance evidence basis

Accepted original-credit-positive project link

Historical project issuance evidence is separate from current operation, retirement, benefit delivery, recipient acknowledgment, VVB assurance and physical CO2 measurement.

Current operating or cancellation status: not established here.

Directory context & crawl scope

An entry/reference/context is directory coverage. It is not a completed file-by-file crawl or eight completed maps.

Whole-project crawl complete: not established by this projection.

All subject audits complete: not established by this projection.

Operations / monitoring context: Selected source context; gaps remain.

Own selected documentary context is available, with its source-specific limits. This is not a completed whole-project crawl, completed map or receipt/compliance verdict.

Historical named method reference
  • Emission reductions from Safe Drinking Water Supply · version 1.0Emission reductions from Safe Drinking Water Supply
    Reference scope & method link

    Source role: OWN_FILED_METHOD_NAME_AND_VERSION_ASSERTION

    Reference status: ACCEPTED_SAFE_METADATA_REUSE_HISTORICAL_OWN_PERIOD_NOT_CURRENT_APPLICATION_REVIEW

    Application review: Not established by this reference.

Applied edition & period
Not yet audited
Project SDG claims
Not yet audited
Verified SDG contribution
Not yet audited

Literal method IDs, titles and versions retain their source roles. No generic registry norm or method reference proves this project’s current compliance or delivered SDGs.

Gold StandardConfirmed historical issuance · project level

Safe Water Programme – Kenya – VPA 33

GS:GS11291

Historical issuance evidence

Institutional chlorination safe water

Issuance evidence basis

Accepted original-credit-positive project link

Historical project issuance evidence is separate from current operation, retirement, benefit delivery, recipient acknowledgment, VVB assurance and physical CO2 measurement.

Current operating or cancellation status: not established here.

Directory context & crawl scope

An entry/reference/context is directory coverage. It is not a completed file-by-file crawl or eight completed maps.

Whole-project crawl complete: not established by this projection.

All subject audits complete: not established by this projection.

Operations / monitoring context: Selected source context; gaps remain.

Own selected documentary context is available, with its source-specific limits. This is not a completed whole-project crawl, completed map or receipt/compliance verdict.

Historical named method reference
  • Emission reductions from Safe Drinking Water Supply · version 1.0Emission reductions from Safe Drinking Water Supply
    Reference scope & method link

    Source role: OWN_FILED_METHOD_NAME_AND_VERSION_ASSERTION

    Reference status: ACCEPTED_SAFE_METADATA_REUSE_HISTORICAL_OWN_PERIOD_NOT_CURRENT_APPLICATION_REVIEW

    Application review: Not established by this reference.

Applied edition & period
Not yet audited
Project SDG claims
Not yet audited
Verified SDG contribution
Not yet audited

Literal method IDs, titles and versions retain their source roles. No generic registry norm or method reference proves this project’s current compliance or delivered SDGs.

What evidence would fill each audit column?
  1. Method and edition

    Own approved design/PDD and exact method ID/title/version; map the applicable design, crediting and monitoring periods and any accepted deviations.

  2. SDG claims and outcomes

    Own dated claim, indicator, baseline, measurement and precise VVB scope; separate proposed from observed or assured contribution.

  3. Institutions and funding

    Own entity/partner mandate, executed award/sale/loan instrument, currency/period, recipient, actual receipt and onward allocation; separate grant, programme total, revenue and technical support.

  4. Governance, contracts and rights

    Own legal/representative structure, dated decisions, signatory authority, land/carbon rights and consent/FPIC instruments; preserve individual/group and edition distinctions.

  5. Benefit entitlement

    Identified recipient/group, promised benefit, trigger and amount/formula/period; state whether conditional on issuance, sale, net revenue or another event.

  6. Benefit allocation

    A dated valid decision or ledger that assigns the specified benefit to that recipient/group and period.

  7. Transfer or service

    Matched payment/service/in-kind delivery records linked to the allocation, dates, amount/unit, intermediaries and net deductions.

  8. Recipient acknowledgment

    Independent or recipient-level evidence identifying what was received, by whom and when, with privacy protected.

  9. VVB assurance scope

    Exact assurance statement, conclusion, period, subject, sampling, exclusions, findings and qualifications; do not promote issuance to universal benefit assurance.

Dated scope, open questions.

The headline count is dated . The project-crediting projection was prepared , with crediting metadata assessed and documentary context through . Individual records retain their earlier source and event dates.

The table groups the study projects once overall. Programme filters can overlap for cross-listed projects; the CER labelling group retains original CDM context. Neither a filter nor a second registry representation establishes another original credit.

  • The catalogue counts source-defined standalone projects and independently defined programme components. Cross-registry physical uniqueness and complete national source coverage remain unresolved.
  • The study roster records historical project crediting. Its three GS-labelled CER cases carry original UNFCCC CDM7359 context; Gold Standard labelling is not a second original issuance. Exact CPA allocation and executed transfer, conversion or surrender remain unresolved.
  • Native issue, certification, record-creation, monitoring and observation dates retain their separate meanings. A selected event is not necessarily the first or latest, and historical evidence does not establish current eligibility or operation.
  • Non-carbon Water Benefit Certificates and ADALY products are excluded from carbon issuance. The GS7587 VER record remains separate from its ADALY record. GS7505/GS11690 duplicate or deactivation context does not add a project, establish a successor or create another original credit.
  • Programme parents are context, not extra components to add above their children. Collective evidence is not allocated equally to children. The Gold Standard programme role for GS12188 remains unresolved.
  • A named methodology or directory label does not establish its applied edition, period, SDG claims, theory of change, compliance or VVB assurance. Current rules are not automatically applied retrospectively to older events.
  • Selected documentary context is not a completed whole-project crawl or benefit-delivery audit. Entitlement, allocation, transfer or service, and recipient acknowledgment each need matched evidence. Unknown cells do not establish an absence of benefits or evidence.
  • Credit quantities, unique original units, physical tonnes removed or sequestered, sales and recipient payments are separate reconciliations. None is inferred from the project count.