Project developer and identified project participants; CME/VPA responsibilities for a Programme of Activities
Confirm eligible physical activity, geography, activity requirements, methodology and requested product; prepare the preliminary-review package and identify all participants.
Principles2.1 §3.1.1(e) requires participant identity/contact information and legal registration/good-standing evidence for organizations. Full product ownership and relevant resource rights must be demonstrated; beneficiary transfers require FPIC. Exact personal account eligibility is not established here.
A local participant is not automatically the registry account holder or CME. GS4GG minimum-SDG rules must not be imposed retrospectively on every legacy GS project.
Documents to assemble
Participant and organization identity/legal standing
Product ownership and any consented transfer of rights
Types marked conditional require the named proponent/coordinator/holder role, rights, agreement and account approval. Not established is an evidence gap, not ineligibility.
Before design approval
Propose and establish
Establish method eligibility, baseline, safeguards and consultation; define direct impacts on at least three SDGs including SDG13 and measurable monitoring indicators. Indicator selection must demonstrate a direct/material causal pathway and use approved tool indicators.
Before verified issuance
Monitor and demonstrate
Monitor actual results against the certified design and applicable impact methodology. Verification and performance review support the requested verified product and assessed impacts. For GSVER vintages2026 onward, PA-aligned method and PA-Alignment Validation are prerequisites; method/design-change gaps can defer verification and issuance.
Design validation tests conformity and expected impacts; performance verification assesses achieved monitored results. Sampling, indicator populations, period and unresolved findings bound the opinion. Indicator-selection conformity is assessed at validation/renewal; erroneous selection found at performance review requires design change.
Development goals are a separate requirement
Which goals must the project demonstrate?
A required SDG contribution, a voluntary label and a theory of change are different tests. The selected edition and product determine which applies.
Development goalsRequired in this edition
Demonstrate direct positive impacts on at least three SDGs including SDG13; compare with baseline and specify monitoring indicators.
Causal logic / theory of changeRequired in this edition
A causal pathway for each selected SDG indicator is required by the2025 indicator rule. A universal separately titled project Theory of Change document is not established in the selected sources.
When it applies: Indicator Selection1.0 from its release date; the requirement for a separately titled ToC document remains unestablished.
Choose technology-relevant indicators from the SDG Impact Tool; direct/material causal pathways, traceability and no double-counting are required. New indicators require approval. VVB assesses selection at validation/renewal; errors found at performance review trigger design change.
When it applies: All GS4GG standalone/PoA/VPA activities from release date, with own project applicability/period bound.
Required by the rules→Chosen in project design→Monitored indicator→Assessor’s finding
Project-selected SDGs, targets and evidence are being joined to the project catalog. A programme requirement does not identify a particular project’s chosen goals or establish delivery to a recipient.
Carbon method, safeguards, rights and benefit-sharing rules
Carbon accountingRequired in this edition
Use applicable activity, impact-methodology and product requirements; method approval and project eligibility remain separate checks.
Safeguard assessment and stakeholder consultation/ongoing engagement are required. Design conformity and achieved-impact assessment occur at different gates.
Carbon accountingDepends on the route or condition
GSVER vintages2026 onward require PA-aligned methodology and successful PA-Alignment Validation. Mixed monitoring periods separate pre2026 results; deferred verification/issuance applies when the method or validated design change is unavailable.
When it applies: Carbon-credit vintages beginning 2026-01-01; other GS4GG use cases require separate applicability clarification.
Eligible land-use planned-unit route only. Later verification and product conversion are required for GSVER treatment; no PER retirement.
Applicant / operatorAssessment / programme reviewIssued units
01
Preliminary Review
Project developer / Gold Standard
Submit key project information, consultation documentation, terms acceptance and applicable fee. Gold Standard checks whether the project can proceed to listing.
signupeligibilitydesign
What the applicant prepares
Confirm the named account/participant role and submit the required identity, authority and agreement documents.
Demonstrate eligibility for the selected activity, product and applicable rule editions.
Prepare the design package, baseline/additionality, monitoring plan and applicable consultation, safeguards and development-impact evidence.
Use only the applicable native route, product, edition and period; actions are a working checklist, not additional normative requirements.
Review the validation and project documents, including consultation and closure of findings; a positive outcome gives Gold Standard Certified Design status.
issuer decisionregistration
What the applicant prepares
Respond to programme review and retain its decision separately from independent assurance.
Submit the native listing/registration package and retain the programme decision with its exact status.
Use only the applicable native route, product, edition and period; actions are a working checklist, not additional normative requirements.
Source-informed display order of functions, not a universal dependency chain. Use branch/pathway and ordering notes; repeated and combined assessments are possible.
What changes between programmes?
Listed follows preliminary review; it is separate from Design Certification and Performance Certification.
Design Certification and Performance Certification are separate decisions; combined design/performance assessment is possible under the rules.
PoA/VPA rules require their own scope and edition mapping; the generic project cycle does not prove inclusion or completion of a component.
What still needs checking?
signup
partial
Submission prerequisites are retained; detailed registry account-opening/KYC workflow is not mapped.
eligibility
partial
Generic principles are not a substitute for the applicable activity and product requirements.
transfer
partial
Retained detailed assignment/retirement passage is the land-use PER/GSVER pathway; do not generalize its full administrative process to every GS product.
These are gaps in this procedure guide. Completing a particular project requires its own evidence.
Retained corpus capture 2026-08-13; project, product and vintage applicability must be established separately. Retained evidence reused on 2026-10-13; no live refresh. Publication date, capture date and applicability are distinct. GHG Emissions Reduction & Sequestration Product Requirements, version 3.2 ↗
Edition 3.2 · 2025-12-12
Retained corpus capture 2026-08-13; project, product and vintage applicability must be established separately. Retained evidence reused on 2026-10-13; no live refresh. Publication date, capture date and applicability are distinct. Requirements for selection of Monitoring Indicators in the SDG Impact Tool ↗