Project → review → issued units

How a project
becomes credits.

Choose a programme. Follow the applicant, the documents, the assessor and the decision that creates the units.

Programme procedure · reviewed guidance, 2026-10-14

Rainbow / Riverse lineage

These boxes explain the procedure. A project’s actual approval and issuance need their own dated documents and registry events.

Rules 7.2 dated 2026-07-02; do not back-apply to legacy Riverse periods.

Jump to the process map ↓
Start here

Who applies—and what do they need?

Project Developer with service agreement and registry account

Submit the Project Application against eligible technology criteria, then complete agreement/KYC and administrative registration before preparing the PDD for validation.

The retained manual specifies developer, agreement and KYC roles, but not a complete natural-person/community legal-form admission policy. Establish project representation and applicable methodology before assuming eligibility.

Registration precedes validation. Rules7.2 recommends two co-benefits; claiming one creates measurement/assurance duties. Historical Riverse credits keep their original edition and identity.

Documents to assemble

  • Project Application, service agreement and KYC
  • Method-specific PDD, additionality/baseline and monitoring evidence
  • Risk assessment, consultation and applicable IPLC consent/benefit-sharing documents
  • Evidence for any claimed co-benefits, updated at verification
Applicant rule and clause

Project certification ↗
Edition child of retained Procedures Manual 3.2 · Application, Registration, Pre-validation

Rainbow Rules: Principles and Requirements ↗
Edition 7.2 parent rules edition · Additionality; Environmental and Social Safeguards; Co-benefits; Monitoring

Types marked conditional require the named proponent/coordinator/holder role, rights, agreement and account approval. Not established is an evidence gap, not ineligibility.

Before design approval

Propose and establish

Establish method eligibility, safeguards and monitoring. Two co-benefits are recommended; claimed co-benefits require quantified evidence. Conditional IPLC benefit sharing belongs in the PDD.

Before verified issuance

Monitor and demonstrate

Monitor and support claimed co-benefits at each verification; update applicable benefit-sharing evidence and ongoing safeguards.

VVB audits claimed co-benefits and ongoing requirements, then programme review supports issuance. A recommendation to claim benefits differs from the mandatory evidence once claimed.

Development goals are a separate requirement

Which goals must the project demonstrate?

A required SDG contribution, a voluntary label and a theory of change are different tests. The selected edition and product determine which applies.

Development goalsDepends on the route or condition

At least two co-benefits are recommended (should). Claimed co-benefits must be quantified, monitored, supported at each verification and audited by a VVB.

When it applies: A co-benefit is claimed; recommendation to have two is separate from evidence duties for claims.

Requirement source and clause

Rainbow Principles and requirements ↗
Edition Child of live Standard Rules 7.2 · Co-benefits

Causal logic / theory of changeNot established in this review

No universal separately named ToC requirement established in the selected rules.

Requirement source and clause

Rainbow Principles and requirements ↗
Edition Child of live Standard Rules 7.2 · Selected principles

Required by the rulesChosen in project designMonitored indicatorAssessor’s finding

Project-selected SDGs, targets and evidence are being joined to the project catalog. A programme requirement does not identify a particular project’s chosen goals or establish delivery to a recipient.

Carbon method, safeguards, rights and benefit-sharing rules
Carbon accountingRequired in this edition

Project-specific methods govern GHG quantification and monitoring; additionality and evidence-based monitoring are audited.

Rainbow Principles and requirements ↗
Edition Child of live Standard Rules 7.2 · Additionality; Monitoring; GHG quantification

Community rights and benefit sharingDepends on the route or condition

IPLC benefit sharing is documented in the PDD and updated at verification; resource/traditional-knowledge use requires appropriate compensation/recognition.

When it applies: Apply stated IPLC circumstances; not proof of any payment

Rainbow Principles and requirements ↗
Edition Child of live Standard Rules 7.2 · Environmental and social safeguards; benefit sharing

SafeguardsRequired in this edition

Environmental/social risk mitigation is part of ongoing monitoring and verification.

Rainbow Principles and requirements ↗
Edition Child of live Standard Rules 7.2 · Environmental and social safeguards; Delivery/Monitoring

Follow the project process

Applicant / operatorAssessment / programme reviewIssued units
  1. 01

    Application

    Project developer / Rainbow

    Submit a Project Application. Rainbow checks eligible technology under the methodology, requests clarification or rejects; accepted applications proceed to registration.

    eligibility
    What the applicant prepares
    • Demonstrate eligibility for the selected activity, product and applicable rule editions.

    Use only the applicable native route, product, edition and period; actions are a working checklist, not additional normative requirements.

    Source and clause

    Project certification ↗
    Edition child of retained Procedures Manual 3.2 · Application

  2. 02

    Registration

    Project developer / Rainbow

    Sign the service agreement, complete KYC and administrative setup, and document registration partners. Rainbow checks double registration and adds the project to its registry.

    signupregistration
    What the applicant prepares
    • Confirm the named account/participant role and submit the required identity, authority and agreement documents.
    • Submit the native listing/registration package and retain the programme decision with its exact status.

    Use only the applicable native route, product, edition and period; actions are a working checklist, not additional normative requirements.

    Source and clause

    Project certification ↗
    Edition child of retained Procedures Manual 3.2 · Registration

  3. 03

    Pre-validation

    Project developer / Rainbow

    Prepare the PDD and evidence on the certification platform for the validation process.

    design
    What the applicant prepares
    • Prepare the design package, baseline/additionality, monitoring plan and applicable consultation, safeguards and development-impact evidence.

    Use only the applicable native route, product, edition and period; actions are a working checklist, not additional normative requirements.

    Source and clause

    Project certification ↗
    Edition child of retained Procedures Manual 3.2 · Pre-validation

  4. 04

    Validation

    Accredited VVB / stakeholders

    Complete the design validation audit, including the required site audit and public-comment process.

    validation
    What the applicant prepares
    • Arrange the required independent or expressly permitted design assessment; answer findings and retain the final design opinion.

    Use only the applicable native route, product, edition and period; actions are a working checklist, not additional normative requirements.

    Source and clause

    Project certification ↗
    Edition child of retained Procedures Manual 3.2 · Validation; Validation audit

  5. 05

    Project validation review

    Rainbow certification team

    Review the VVB result, project documents and public comments and resolve findings. A positive validation outcome establishes the validated project date and eligibility for the subsequent issuance process.

    issuer decision
    What the applicant prepares
    • Respond to programme review and retain its decision separately from independent assurance.

    Use only the applicable native route, product, edition and period; actions are a working checklist, not additional normative requirements.

    Source and clause

    Project certification ↗
    Edition child of retained Procedures Manual 3.2 · Project validation review

  6. 06

    Monitoring

    Project developer

    Record project performance and prepare the monitoring report for the reporting period.

    monitoring
    What the applicant prepares
    • Implement the applicable monitoring plan for the actual period and keep supporting records separate from forecasts.

    Use only the applicable native route, product, edition and period; actions are a working checklist, not additional normative requirements.

    Source and clause

    Project certification ↗
    Edition child of retained Procedures Manual 3.2 · Monitoring and verification / Monitoring

  7. 07

    Verification audit

    Accredited VVB

    Audit monitoring evidence and quantified outcomes under the applicable requirements. Validation and the first verification may be combined where allowed.

    verification
    What the applicant prepares
    • Submit period evidence for the required assurance route; resolve findings and retain the opinion’s scope and limitations.

    Use only the applicable native route, product, edition and period; actions are a working checklist, not additional normative requirements.

    Source and clause

    Project certification ↗
    Edition child of retained Procedures Manual 3.2 · Monitoring and verification / Verification audit

  8. 08

    Verification review and issuance

    Rainbow certification team / Rainbow Registry

    Review the verification report and supporting monitoring evidence, resolve concerns and issue the supported Rainbow Carbon Credits (RCCs) with their registry attributes.

    issuer decisionissuance
    What the applicant prepares
    • Respond to programme review and retain its decision separately from independent assurance.
    • Request the eligible product and retain the actual completed issuance event; an approval or estimate alone is insufficient.

    Use only the applicable native route, product, edition and period; actions are a working checklist, not additional normative requirements.

    Source and clause

    Project certification ↗
    Edition child of retained Procedures Manual 3.2 · Monitoring and verification / Verification review and issuance

  9. 09

    Transfers

    Registry account holders

    Transfer owned RCCs to an active buyer account, with sender and recipient confirmation and registry ownership history. The retained procedure does not permit transfers outside the Rainbow registry.

    transfer
    What the applicant prepares
    • For an eligible issued product, retain the completed account-movement record; assess commercial sale evidence separately.

    Use only the applicable native route, product, edition and period; actions are a working checklist, not additional normative requirements.

    Source and clause

    Rainbow Carbon Credits ↗
    Edition child of retained Procedures Manual 3.2 · Transfers

  10. 10

    Retirements

    Credit owner / Rainbow Registry

    Retire owned units for a publicly identified beneficiary and purpose. The registry creates the retirement certificate and prevents subsequent unit events.

    retirement
    What the applicant prepares
    • Check product-use eligibility and retain the completed retirement/cancellation record and named purpose or beneficiary.

    Use only the applicable native route, product, edition and period; actions are a working checklist, not additional normative requirements.

    Source and clause

    Rainbow Carbon Credits ↗
    Edition child of retained Procedures Manual 3.2 · Retirements

Source-informed display order of functions, not a universal dependency chain. Use branch/pathway and ordering notes; repeated and combined assessments are possible.

What changes between programmes?

Administrative registration precedes prepared design, validation and design review.

  • Registration precedes pre-validation and validation in this manual; preserve that ordering.
  • Retained manual landing states v3.2 dated 2026-07-02; child pages are associated with that landing but have no independently printed date.
  • Riverse lineage is one programme-family mapping. Historical Riverse events need their own applicable documents; do not relabel or duplicate them as new Rainbow issuance.

What still needs checking?

eligibility

partial

Application-screen rules are mapped; complete technology eligibility remains methodology-specific.

These are gaps in this procedure guide. Completing a particular project requires its own evidence.

Rules behind this map

Rainbow Procedures Manual ↗

Edition 3.2 · 2026-07-02

Edition landing reused with its child procedure pages. Riverse historical events require their own applicable edition. Retained evidence reused on 2026-10-13; no live refresh. Publication date, capture date and applicability are distinct.
Project certification ↗

Edition child of retained Procedures Manual 3.2 · Publication date not established

Child page does not independently print a release date; edition association comes from manual landing. Retained evidence reused on 2026-10-13; no live refresh. Publication date, capture date and applicability are distinct.
Rainbow Carbon Credits ↗

Edition child of retained Procedures Manual 3.2 · Publication date not established

Retained RCC terminology must not relabel historical Riverse units without evidence. Retained evidence reused on 2026-10-13; no live refresh. Publication date, capture date and applicability are distinct.
Rainbow Principles and requirements ↗

Edition Child of live Standard Rules 7.2 · Publication date not established · Checked 2026-10-13

Child page not separately dated; do not back-apply to Riverse historical periods. Selected relevant primary-source sections through web retrieval; not whole-document QA
Rainbow Rules: Principles and Requirements ↗

Edition 7.2 parent rules edition · 2026-07-02 · Checked 2026-10-14

Publication date and access date differ; applicable methodology, corrections and transition rules still need a project-specific decision. Selected applicant, design, SDG, assurance or label sections; not whole-rulebook QA.