Project → review → issued units

How a project
becomes credits.

Choose a programme. Follow the applicant, the documents, the assessor and the decision that creates the units.

Programme procedure · reviewed guidance, 2026-10-14

Isometric

These boxes explain the procedure. A project’s actual approval and issuance need their own dated documents and registry events.

Standard URL/header 2.1 has an internal version-2.0 citation mismatch; bind certified Protocol/minor version/modules.

Jump to the process map ↓
Start here

Who applies—and what do they need?

One Project Proponent owning the claimed removal/reduction rights

Choose a certified Protocol and its locked module versions, establish a sole proponent and rights, and submit the PDD and monitoring plan.

Standard2.1 §§3.1–3.3 requires legal rights, a single proponent where several parties contribute, eligible protocol/application and registration. Exact account legal-form eligibility is not established by this source.

Protocol certification is not project approval. VVB validation/verification and Isometric acceptance are separate, and delivery/transfer does not prove a paid trade.

Documents to assemble

  • Legal rights/sole-proponent representation
  • PDD, Protocol/module versions and monitoring plan
  • Baseline, GHG statement boundaries and accounting evidence
  • Stakeholder input and environmental/social assessment/remediation
Applicant rule and clause

Isometric Standard ↗
Edition 2.1 · §§1.3,2.1–2.2,3.1–3.3,3.8–3.11

Types marked conditional require the named proponent/coordinator/holder role, rights, agreement and account approval. Not established is an evidence gap, not ineligibility.

Before design approval

Propose and establish

Establish Protocol conformity, additionality and ongoing impact/risk arrangements; assess SDG consistency where relevant and feasible. EIA/SIA depends on significant impacts or law.

Before verified issuance

Monitor and demonstrate

Demonstrate verified removals and ongoing environmental/social conditions. CORSIA adds its own reporting scope.

VVB evaluates the Standard and exact Protocol version; Isometric reviews verification. Ongoing no-net-harm evaluation is not proof of every positive welfare claim.

Development goals are a separate requirement

Which goals must the project demonstrate?

A required SDG contribution, a voluntary label and a theory of change are different tests. The selected edition and product determine which applies.

Development goalsDepends on the route or condition

Demonstrate consistency with relevant jurisdictional SDG objectives where relevant and feasible; additional reporting applies for CORSIA-eligible units.

When it applies: Jurisdictional SDG objective is relevant and feasible; CORSIA conditions apply only to requested CORSIA eligibility.

Requirement source and clause

Isometric Standard ↗
Edition URL/header 2.1 · R-BWX0-0; §5.8 CORSIA

Causal logic / theory of changeNot established in this review

A universal named project ToC requirement is not established by the selected Standard sections.

Requirement source and clause

Isometric Standard ↗
Edition URL/header 2.1 · Selected §§2.1–2.2,3.10

Required by the rulesChosen in project designMonitored indicatorAssessor’s finding

Project-selected SDGs, targets and evidence are being joined to the project catalog. A programme requirement does not identify a particular project’s chosen goals or establish delivery to a recipient.

Carbon method, safeguards, rights and benefit-sharing rules
Carbon accountingRequired in this edition

Validate projects and verify outcomes against a certified Protocol. Protocol minor versions lock their incorporated module versions.

Isometric Standard ↗
Edition URL/header 2.1 · §§2.1–2.2

SafeguardsRequired in this edition

Assess ongoing environmental/social impacts and avoid net harm; remediate harm. Independent EIA/SIA is required where impacts are significant or law requires it.

Isometric Standard ↗
Edition URL/header 2.1 · §3.10, R-X9EC-0; G-1T3C-0

Follow the project process

Applicant / operatorAssessment / programme reviewIssued units
  1. 01

    Project Ownership; Project Documentation; Project Eligibility

    Project proponent / Isometric

    Establish the necessary rights and project representation, submit the PDD and monitoring plan, use an eligible Protocol and satisfy registration requirements. Public comment applies to the project documentation.

    signupeligibilitydesign
    What the applicant prepares
    • Confirm the named account/participant role and submit the required identity, authority and agreement documents.
    • Demonstrate eligibility for the selected activity, product and applicable rule editions.
    • Prepare the design package, baseline/additionality, monitoring plan and applicable consultation, safeguards and development-impact evidence.

    Use only the applicable native route, product, edition and period; actions are a working checklist, not additional normative requirements.

    Source and clause

    Isometric Standard ↗
    Edition 2.1 · §§3.1-3.3

  2. 02

    Validation and Verification Process

    Approved VVB

    Assess the project against the Standard and applicable Protocol. Validation may be carried out with the first verification.

    validation
    What the applicant prepares
    • Arrange the required independent or expressly permitted design assessment; answer findings and retain the final design opinion.

    Use only the applicable native route, product, edition and period; actions are a working checklist, not additional normative requirements.

    Source and clause

    Isometric Standard ↗
    Edition 2.1 · §4.2, initial validation provisions

  3. 03

    Validated; Approval Date

    Isometric

    Review the validation result and accept, seek clarification or reject. A positive decision gives Validated status and an Approval Date that is also the registration date.

    issuer decisionregistration
    What the applicant prepares
    • Respond to programme review and retain its decision separately from independent assurance.
    • Submit the native listing/registration package and retain the programme decision with its exact status.

    Use only the applicable native route, product, edition and period; actions are a working checklist, not additional normative requirements.

    Source and clause

    Isometric Standard ↗
    Edition 2.1 · §4.2, validation outcome and Approval Date provisions

  4. 04

    GHG Statement

    Project proponent

    Report monitored removals or reductions with the supporting evidence required by the project monitoring plan and applicable Protocol.

    monitoring
    What the applicant prepares
    • Implement the applicable monitoring plan for the actual period and keep supporting records separate from forecasts.

    Use only the applicable native route, product, edition and period; actions are a working checklist, not additional normative requirements.

    Source and clause

    Isometric Standard ↗
    Edition 2.1 · §§3.2,4.2

  5. 05

    Validation and Verification Process

    Approved VVB

    Independently verify the project GHG statement and supporting evidence before credits can be issued.

    verification
    What the applicant prepares
    • Submit period evidence for the required assurance route; resolve findings and retain the opinion’s scope and limitations.

    Use only the applicable native route, product, edition and period; actions are a working checklist, not additional normative requirements.

    Source and clause

    Isometric Standard ↗
    Edition 2.1 · §4.2, verification provisions

  6. 06

    Isometric review of the Verification Report

    Isometric

    Review the verification report, request any necessary clarification and accept or reject the reported outcome.

    issuer decision
    What the applicant prepares
    • Respond to programme review and retain its decision separately from independent assurance.

    Use only the applicable native route, product, edition and period; actions are a working checklist, not additional normative requirements.

    Source and clause

    Isometric Standard ↗
    Edition 2.1 · §4.2, Isometric review provisions

  7. 07

    Issuance Process

    Isometric Registry

    Issue credits to the Project Proponent based on accepted verified net removals or reductions.

    issuance
    What the applicant prepares
    • Request the eligible product and retain the actual completed issuance event; an approval or estimate alone is insufficient.

    Use only the applicable native route, product, edition and period; actions are a working checklist, not additional normative requirements.

    Source and clause

    Isometric Standard ↗
    Edition 2.1 · §5.2

  8. 08

    Transfer and Delivery Rules and Ownership History

    Registry account holders / Isometric

    Record initial delivery from Project Proponent to buyer and subsequent account-to-account transfers with ownership history.

    transfer
    What the applicant prepares
    • For an eligible issued product, retain the completed account-movement record; assess commercial sale evidence separately.

    Use only the applicable native route, product, edition and period; actions are a working checklist, not additional normative requirements.

    Source and clause

    Isometric Standard ↗
    Edition 2.1 · §5.3

  9. 09

    Retirement Rules

    Credit owner / Isometric Registry

    The holder retires owned credits for a beneficiary; the registry records retirement and prevents the same credit being retired again.

    retirement
    What the applicant prepares
    • Check product-use eligibility and retain the completed retirement/cancellation record and named purpose or beneficiary.

    Use only the applicable native route, product, edition and period; actions are a working checklist, not additional normative requirements.

    Source and clause

    Isometric Standard ↗
    Edition 2.1 · §5.4

Source-informed display order of functions, not a universal dependency chain. Use branch/pathway and ordering notes; repeated and combined assessments are possible.

What changes between programmes?

Eligibility, validation and approval are separate; validation can coincide with first verification.

  • The retained source explicitly labels version 2.1; its release date is not established by this snapshot.
  • Project validation/registration and Protocol approval are distinct programme decisions.
  • Delivery and transfer are registry movements; neither alone proves an arm’s-length paid trade.

What still needs checking?

signup

partial

Rights and submission prerequisites are documented; detailed account opening/KYC requirements are not retained.

eligibility

partial

The Standard points to the applicable Protocol; the complete protocol-level eligibility and measurement requirements are not exported.

These are gaps in this procedure guide. Completing a particular project requires its own evidence.

Rules behind this map

Isometric Standard ↗

Edition 2.1 · Publication date not established

Version label observed; exact release date not retained. Standard first-publication date is not the v2.1 date. Retained evidence reused on 2026-10-13; no live refresh. Publication date, capture date and applicability are distinct. Reader returned no matching retained bytes; do not rely on this path as a verified original in this handoff.
Isometric Standard ↗

Edition URL/header 2.1 · Publication date not established · Checked 2026-10-13

Internal citation paragraph says version 2.0; retain this inconsistency. Protocol/minor-version/module bindings are separate. Selected relevant primary-source sections through web retrieval; not whole-document QA
Isometric Standard ↗

Edition 2.1 · Publication date not established · Checked 2026-10-14

Fresh capture of version2.1; original iso21 local read did not match its retained pin. Selected applicant, design, SDG, assurance or label sections; not whole-rulebook QA.