Project → review → issued units

How a project
becomes credits.

Choose a programme. Follow the applicant, the documents, the assessor and the decision that creates the units.

Programme procedure · reviewed guidance, 2026-10-14

Gold Standard for the Global Goals

These boxes explain the procedure. A project’s actual approval and issuance need their own dated documents and registry events.

Principles2.1 (2025-01-31), Indicator Selection1.0 (2025-10-18), and PA Alignment1.2 (2026-10-02) have distinct scopes.

Jump to the process map ↓
Start here

Who applies—and what do they need?

Project developer and identified project participants; CME/VPA responsibilities for a Programme of Activities

Confirm eligible physical activity, geography, activity requirements, methodology and requested product; prepare the preliminary-review package and identify all participants.

Principles2.1 §3.1.1(e) requires participant identity/contact information and legal registration/good-standing evidence for organizations. Full product ownership and relevant resource rights must be demonstrated; beneficiary transfers require FPIC. Exact personal account eligibility is not established here.

A local participant is not automatically the registry account holder or CME. GS4GG minimum-SDG rules must not be imposed retrospectively on every legacy GS project.

Documents to assemble

  • Participant and organization identity/legal standing
  • Product ownership and any consented transfer of rights
  • PDD, applicable activity/product/methodology versions
  • Stakeholder consultation, safeguard assessment, SDG indicators and baseline/monitoring plan
Applicant rule and clause

Gold Standard Principles & Requirements, version 2.1 ↗
Edition 2.1 · §3.1.1(a)–(h), §§4.1.3–4.1.19, §5.1

Types marked conditional require the named proponent/coordinator/holder role, rights, agreement and account approval. Not established is an evidence gap, not ineligibility.

Before design approval

Propose and establish

Establish method eligibility, baseline, safeguards and consultation; define direct impacts on at least three SDGs including SDG13 and measurable monitoring indicators. Indicator selection must demonstrate a direct/material causal pathway and use approved tool indicators.

Before verified issuance

Monitor and demonstrate

Monitor actual results against the certified design and applicable impact methodology. Verification and performance review support the requested verified product and assessed impacts. For GSVER vintages2026 onward, PA-aligned method and PA-Alignment Validation are prerequisites; method/design-change gaps can defer verification and issuance.

Design validation tests conformity and expected impacts; performance verification assesses achieved monitored results. Sampling, indicator populations, period and unresolved findings bound the opinion. Indicator-selection conformity is assessed at validation/renewal; erroneous selection found at performance review requires design change.

Development goals are a separate requirement

Which goals must the project demonstrate?

A required SDG contribution, a voluntary label and a theory of change are different tests. The selected edition and product determine which applies.

Development goalsRequired in this edition

Demonstrate direct positive impacts on at least three SDGs including SDG13; compare with baseline and specify monitoring indicators.

Requirement source and clause

Gold Standard Principles & Requirements, version 2.1 ↗
Edition 2.1 · §§4.1.12–4.1.19, physical pp9–10

Causal logic / theory of changeRequired in this edition

A causal pathway for each selected SDG indicator is required by the2025 indicator rule. A universal separately titled project Theory of Change document is not established in the selected sources.

When it applies: Indicator Selection1.0 from its release date; the requirement for a separately titled ToC document remains unestablished.

Requirement source and clause

Gold Standard Principles & Requirements, version 2.1 ↗
Edition 2.1 · §§4.1.14–4.1.19

Requirements for selection of Monitoring Indicators in the SDG Impact Tool ↗
Edition 1.0 · §§3.1.5,4.2.6

Development goalsRequired in this edition

Choose technology-relevant indicators from the SDG Impact Tool; direct/material causal pathways, traceability and no double-counting are required. New indicators require approval. VVB assesses selection at validation/renewal; errors found at performance review trigger design change.

When it applies: All GS4GG standalone/PoA/VPA activities from release date, with own project applicability/period bound.

Requirement source and clause

Requirements for selection of Monitoring Indicators in the SDG Impact Tool ↗
Edition 1.0 · §§1–4,6; physical pp3–5

Required by the rulesChosen in project designMonitored indicatorAssessor’s finding

Project-selected SDGs, targets and evidence are being joined to the project catalog. A programme requirement does not identify a particular project’s chosen goals or establish delivery to a recipient.

Carbon method, safeguards, rights and benefit-sharing rules
SafeguardsRequired in this edition

Safeguard assessment and stakeholder consultation/ongoing engagement are required. Design conformity and achieved-impact assessment occur at different gates.

Gold Standard Principles & Requirements, version 2.1 ↗
Edition 2.1 · Principles 2–4; §§4.1.25, 4.1.36; §5.1

Carbon accountingDepends on the route or condition

GSVER vintages2026 onward require PA-aligned methodology and successful PA-Alignment Validation. Mixed monitoring periods separate pre2026 results; deferred verification/issuance applies when the method or validated design change is unavailable.

When it applies: Carbon-credit vintages beginning 2026-01-01; other GS4GG use cases require separate applicability clarification.

Requirements for Paris Agreement Alignment ↗
Edition 1.2 · §§1.2–1.5,2,3.1; physical pp4–6

Choose the product route

Product-specific rules still apply; combined validation/verification possible. The detailed unit-use clause mapped here is the land-use product route.

Applicant / operatorAssessment / programme reviewIssued units
  1. 01

    Preliminary Review

    Project developer / Gold Standard

    Submit key project information, consultation documentation, terms acceptance and applicable fee. Gold Standard checks whether the project can proceed to listing.

    signupeligibilitydesign
    What the applicant prepares
    • Confirm the named account/participant role and submit the required identity, authority and agreement documents.
    • Demonstrate eligibility for the selected activity, product and applicable rule editions.
    • Prepare the design package, baseline/additionality, monitoring plan and applicable consultation, safeguards and development-impact evidence.

    Use only the applicable native route, product, edition and period; actions are a working checklist, not additional normative requirements.

    Source and clause

    Gold Standard Principles & Requirements, version 2.1 ↗
    Edition 2.1 · §5.1.1, §§5.1.3-5.1.10, physical pp19-23

  2. 02

    Listed

    Gold Standard

    Successful preliminary review leads to public listing. Listed status is not design or performance certification.

    registration
    What the applicant prepares
    • Submit the native listing/registration package and retain the programme decision with its exact status.

    Use only the applicable native route, product, edition and period; actions are a working checklist, not additional normative requirements.

    Source and clause

    Gold Standard Principles & Requirements, version 2.1 ↗
    Edition 2.1 · §§5.1.11-5.1.12, physical p23

  3. 03

    Validation

    Approved eligible VVB

    Assess the project design, monitoring plan and supporting evidence against applicable requirements; submit the final validation report.

    validation
    What the applicant prepares
    • Arrange the required independent or expressly permitted design assessment; answer findings and retain the final design opinion.

    Use only the applicable native route, product, edition and period; actions are a working checklist, not additional normative requirements.

    Source and clause

    Gold Standard Principles & Requirements, version 2.1 ↗
    Edition 2.1 · §§5.1.13-5.1.17, physical pp23-24

  4. 04

    Design Review

    Gold Standard

    Review the validation and project documents, including consultation and closure of findings; a positive outcome gives Gold Standard Certified Design status.

    issuer decisionregistration
    What the applicant prepares
    • Respond to programme review and retain its decision separately from independent assurance.
    • Submit the native listing/registration package and retain the programme decision with its exact status.

    Use only the applicable native route, product, edition and period; actions are a working checklist, not additional normative requirements.

    Source and clause

    Gold Standard Principles & Requirements, version 2.1 ↗
    Edition 2.1 · §§5.1.18-5.1.24, physical pp24-25

  5. 05

    Annual Reporting

    Project developer

    Maintain monitoring evidence and submit annual updates where verification is not completed. Annual reporting alone does not certify impacts.

    monitoring
    What the applicant prepares
    • Implement the applicable monitoring plan for the actual period and keep supporting records separate from forecasts.

    Use only the applicable native route, product, edition and period; actions are a working checklist, not additional normative requirements.

    Source and clause

    Gold Standard Principles & Requirements, version 2.1 ↗
    Edition 2.1 · §§5.1.39-5.1.44, physical pp27-28

  6. 06

    Verification

    Approved eligible VVB

    Assess the monitoring report and supporting evidence; a positive final verification report proceeds to Gold Standard review.

    verification
    What the applicant prepares
    • Submit period evidence for the required assurance route; resolve findings and retain the opinion’s scope and limitations.

    Use only the applicable native route, product, edition and period; actions are a working checklist, not additional normative requirements.

    Source and clause

    Gold Standard Principles & Requirements, version 2.1 ↗
    Edition 2.1 · §§5.1.25-5.1.30, physical pp25-26

  7. 07

    Performance Review

    Gold Standard

    Review verification and monitoring evidence and resolve findings. Positive performance review leads to Gold Standard Certified Project status.

    issuer decision
    What the applicant prepares
    • Respond to programme review and retain its decision separately from independent assurance.

    Use only the applicable native route, product, edition and period; actions are a working checklist, not additional normative requirements.

    Source and clause

    Gold Standard Principles & Requirements, version 2.1 ↗
    Edition 2.1 · §§5.1.31-5.1.36, physical pp26-27

  8. 08

    Issuance of Gold Standard Certified Products or Impact Statements

    Gold Standard / Impact Registry

    Issue the eligible product after successful performance certification and required payment. The product requirements control whether that product is a GSVER, another unit or an impact statement.

    issuance
    What the applicant prepares
    • Request the eligible product and retain the actual completed issuance event; an approval or estimate alone is insufficient.

    Use only the applicable native route, product, edition and period; actions are a working checklist, not additional normative requirements.

    Source and clause

    Gold Standard Principles & Requirements, version 2.1 ↗
    Edition 2.1 · §2.2.1 and §5.1.36(b), physical pp5,27

  9. 09

    Assignment and Retirement Procedure

    Impact Registry account holder

    PERs may be transferred or assigned but not retired; converted GSVERs can be transferred and retired under the registry procedure.

    transferretirement
    What the applicant prepares
    • For an eligible issued product, retain the completed account-movement record; assess commercial sale evidence separately.
    • Check product-use eligibility and retain the completed retirement/cancellation record and named purpose or beneficiary.

    Use only the applicable native route, product, edition and period; actions are a working checklist, not additional normative requirements.

    Source and clause

    GHG Emissions Reduction & Sequestration Product Requirements, version 3.2 ↗
    Edition 3.2 · Annex B §2, physical p46

Source-informed display order of functions, not a universal dependency chain. Use branch/pathway and ordering notes; repeated and combined assessments are possible.

What changes between programmes?

Listed follows preliminary review; it is separate from Design Certification and Performance Certification.

  • Design Certification and Performance Certification are separate decisions; combined design/performance assessment is possible under the rules.
  • PoA/VPA rules require their own scope and edition mapping; the generic project cycle does not prove inclusion or completion of a component.

What still needs checking?

signup

partial

Submission prerequisites are retained; detailed registry account-opening/KYC workflow is not mapped.

eligibility

partial

Generic principles are not a substitute for the applicable activity and product requirements.

transfer

partial

Retained detailed assignment/retirement passage is the land-use PER/GSVER pathway; do not generalize its full administrative process to every GS product.

These are gaps in this procedure guide. Completing a particular project requires its own evidence.

Rules behind this map

Gold Standard Principles & Requirements, version 2.1 ↗

Edition 2.1 · 2025-01-31

Retained corpus capture 2026-08-13; project, product and vintage applicability must be established separately. Retained evidence reused on 2026-10-13; no live refresh. Publication date, capture date and applicability are distinct.