Project → review → issued units

How a project
becomes credits.

Choose a programme. Follow the applicant, the documents, the assessor and the decision that creates the units.

Programme procedure · reviewed guidance, 2026-10-14

Global Carbon Council

These boxes explain the procedure. A project’s actual approval and issuance need their own dated documents and registry events.

GCC Project Standard 4.0; current GCC 2.0 process mapping remains partial.

Jump to the process map ↓
Start here

Who applies—and what do they need?

Project Owner through its authorized focal point and registry account holder

Identify the GCC project type and chosen label package, establish the registered legal entity/focal point, and submit the PSF through the project portal.

Project Standard4.1 §4(d), footnote4, and §5 footnote6 identify legal-entity/host-country compliance and the designated registered-entity focal point. This does not establish a direct standalone individual application route.

SDG+ and market labels have additional requirements; labels, carbon ACCs and energy ARECs are separate. GCC4.1 is an additive requirements reference, not a replacement for every GCC1.0/2.0 historic procedure.

Documents to assemble

  • Legal entity, focal-point authorization and host-country permits
  • PSF, project type, methodology/version and label selection
  • Baseline/additionality, monitoring and local consultation evidence
  • Separate transaction-registry KYC and account documents
Applicant rule and clause

GCC Project Standard ↗
Edition 4.1 · §§4–5, footnotes4,6; §§9.1–9.14

GCC 2.0 Program Framework ↗
Edition 4.0 · §10.2.2

Types marked conditional require the named proponent/coordinator/holder role, rights, agreement and account approval. Not established is an evidence gap, not ineligibility.

Before design approval

Propose and establish

Establish method/eligibility and the requested label package. SDG+ is additional; minimum SDG levels and safeguard-label conditions depend on chosen CA+, CCP, CORSIA or other relevant labels.

Before verified issuance

Monitor and demonstrate

Monitor claimed labels and mitigation. Outcome verification and issuance review determine supported claims; unsupported optional labels cannot be presented as achieved.

GCC project verification evaluates design; outcome verification evaluates reported performance. Do not apply a market-label condition to all projects.

Development goals are a separate requirement

Which goals must the project demonstrate?

A required SDG contribution, a voluntary label and a theory of change are different tests. The selected edition and product determine which applies.

Development goalsDepends on the route or condition

SDG+ is an additional certification label, with minimum levels tied to requested market labels; monitor claimed indicators and withhold unsupported label claims.

When it applies: Check chosen SDG+, CA+, CCP or CORSIA label and applicable edition

Requirement source and clause

GCC Project Standard ↗
Edition 4.0 · §§ on SDG+ physical p13; §§135–137 physical p50

Causal logic / theory of changeNot established in this review

A universal separately named ToC requirement is not established in the inspected Project Standard sections.

Requirement source and clause

GCC Project Standard ↗
Edition 4.0 · Selected impact and monitoring sections

Required by the rulesChosen in project designMonitored indicatorAssessor’s finding

Project-selected SDGs, targets and evidence are being joined to the project catalog. A programme requirement does not identify a particular project’s chosen goals or establish delivery to a recipient.

Carbon method, safeguards, rights and benefit-sharing rules
Carbon accountingRequired in this edition

Project design must meet the Project Standard and applicable GCC/CDM/Article 6.4 methodologies.

GCC Project Standard ↗
Edition 4.0 · Introduction and methodological requirements

SafeguardsDepends on the route or condition

Environmental/social labels and their monitored parameters have specified assessment and deviation rules. The selected label package controls scope.

When it applies: Chosen E+/S+ or other market-label package and its edition trigger the relevant criteria.

GCC Project Standard ↗
Edition 4.0 · §11.2.2; §§164 onward

Follow the project process

Applicant / operatorAssessment / programme reviewIssued units
  1. 01

    Account setup on GCC Portal and submission of project documents

    Project owner / GCC Operations Team

    Open the project-portal account and submit the Project Submission Form (PSF) and required documents. GCC checks completeness and applicable project eligibility.

    signupeligibilitydesign
    What the applicant prepares
    • Confirm the named account/participant role and submit the required identity, authority and agreement documents.
    • Demonstrate eligibility for the selected activity, product and applicable rule editions.
    • Prepare the design package, baseline/additionality, monitoring plan and applicable consultation, safeguards and development-impact evidence.

    Use only the applicable native route, product, edition and period; actions are a working checklist, not additional normative requirements.

    Source and clause

    Project Registration & Issuance ↗
    Unversioned source · Project Registration, steps 1-2

  2. 02

    Global Stakeholder Consultations

    GCC / stakeholders

    Publish the submitted project for stakeholder consultation before completing the registration review.

    design
    What the applicant prepares
    • Prepare the design package, baseline/additionality, monitoring plan and applicable consultation, safeguards and development-impact evidence.

    Use only the applicable native route, product, edition and period; actions are a working checklist, not additional normative requirements.

    Source and clause

    Project Registration & Issuance ↗
    Unversioned source · Project Registration, step 3

  3. 03

    Verification of project documents

    GCC Approved Verifier

    The programme calls this project-design assessment verification. Obtain the verifier report and submit a Request for Registration (RFR).

    validation
    What the applicant prepares
    • Arrange the required independent or expressly permitted design assessment; answer findings and retain the final design opinion.

    Use only the applicable native route, product, edition and period; actions are a working checklist, not additional normative requirements.

    Source and clause

    Project Registration & Issuance ↗
    Unversioned source · Project Registration, step 4

  4. 04

    Assessment of submitted verified project documents

    GCC Operations Team / Steering Committee

    Check the RFR for completeness, assess verified documents and prepare a recommendation; a committee member may undertake a parallel assessment.

    issuer decision
    What the applicant prepares
    • Respond to programme review and retain its decision separately from independent assurance.

    Use only the applicable native route, product, edition and period; actions are a working checklist, not additional normative requirements.

    Source and clause

    Project Registration & Issuance ↗
    Unversioned source · Project Registration, steps 5-7

  5. 05

    Steering Committee consideration

    GCC Steering Committee

    Decide whether to register or reject the project and publish the decision on the project portal and registry.

    issuer decisionregistration
    What the applicant prepares
    • Respond to programme review and retain its decision separately from independent assurance.
    • Submit the native listing/registration package and retain the programme decision with its exact status.

    Use only the applicable native route, product, edition and period; actions are a working checklist, not additional normative requirements.

    Source and clause

    Project Registration & Issuance ↗
    Unversioned source · Project Registration, steps 8-9

  6. 06

    Project Monitoring Report (PMR)

    Project owner

    Implement the registered activity and monitor against the approved PSF. Prepare a PMR for each reporting period.

    monitoring
    What the applicant prepares
    • Implement the applicable monitoring plan for the actual period and keep supporting records separate from forecasts.

    Use only the applicable native route, product, edition and period; actions are a working checklist, not additional normative requirements.

    Source and clause

    Project Registration & Issuance ↗
    Unversioned source · Issuance of ACCs, paragraphs 1-2

  7. 07

    Verification of the Project Monitoring Report

    GCC-registered verifier

    Verify the reporting-period reductions or removals before the project owner submits the formal issuance request.

    verification
    What the applicant prepares
    • Submit period evidence for the required assurance route; resolve findings and retain the opinion’s scope and limitations.

    Use only the applicable native route, product, edition and period; actions are a working checklist, not additional normative requirements.

    Source and clause

    Project Registration & Issuance ↗
    Unversioned source · Issuance of ACCs, paragraph 2

  8. 08

    Opening Registry Account

    Account holder / GCC / S&P Global

    Complete registry account documentation, KYC and contractual requirements. The transaction-registry account is distinct from the project-portal submission account.

    signup
    What the applicant prepares
    • Confirm the named account/participant role and submit the required identity, authority and agreement documents.

    Use only the applicable native route, product, edition and period; actions are a working checklist, not additional normative requirements.

    Source and clause

    GCC 2.0 Program Framework ↗
    Edition 4.0 · §10.2.2, physical p53

  9. 09

    Issuance of ACCs

    GCC Operations Team / Steering Committee

    Operations conducts completeness and technical review; the Steering Committee approves or rejects the issuance request.

    issuer decision
    What the applicant prepares
    • Respond to programme review and retain its decision separately from independent assurance.

    Use only the applicable native route, product, edition and period; actions are a working checklist, not additional normative requirements.

    Source and clause

    Project Registration & Issuance ↗
    Unversioned source · Issuance of ACCs, paragraph 3

  10. 10

    Issuance of GCC Credits

    GCC / transaction registry

    After Steering Committee approval, ACCs are credited to the designated registry account.

    issuance
    What the applicant prepares
    • Request the eligible product and retain the actual completed issuance event; an approval or estimate alone is insufficient.

    Use only the applicable native route, product, edition and period; actions are a working checklist, not additional normative requirements.

    Source and clause

    GCC 2.0 Program Framework ↗
    Edition 4.0 · §10.2.3, physical p54

  11. 11

    Transfer of GCC Credits

    Account holder / GCC registry team

    Request transfer of eligible holdings to another registry account; registry checks and approval precede debiting and crediting the accounts.

    transfer
    What the applicant prepares
    • For an eligible issued product, retain the completed account-movement record; assess commercial sale evidence separately.

    Use only the applicable native route, product, edition and period; actions are a working checklist, not additional normative requirements.

    Source and clause

    GCC 2.0 Program Framework ↗
    Edition 4.0 · §10.2.4, physical pp54-55

  12. 12

    Retirement of GCC Credits

    Account holder / GCC registry

    Retirement removes ACCs from further use under the registry procedure; cancellation is separately described.

    retirement
    What the applicant prepares
    • Check product-use eligibility and retain the completed retirement/cancellation record and named purpose or beneficiary.

    Use only the applicable native route, product, edition and period; actions are a working checklist, not additional normative requirements.

    Source and clause

    GCC 2.0 Program Framework ↗
    Edition 4.0 · §§10.2.5-10.2.6, physical pp55-56

Source-informed display order of functions, not a universal dependency chain. Use branch/pathway and ordering notes; repeated and combined assessments are possible.

What changes between programmes?

Submission and global consultation are distinct from project verification and registration decision.

  • GCC 1.0 and GCC 2.0 belong to the same family; apply the correct edition to each project rather than assigning this GCC 2.0 framework retrospectively.
  • The overview has ambiguous wording suggesting approval follows issuance. The export follows the explicit framework §10.2.3 sequence: Steering Committee approval, then crediting.
  • Project-portal submission and transaction-registry account opening are distinct administrative steps.

What still needs checking?

eligibility

partial

Framework and overview refer to eligible project types and additionality; the complete Project Standard/methodology eligibility checklist is not exported.

registration

partial

Overview steps and framework retained; the detailed Program Processes v4 document was linked but not acquired.

issuer decision

partial

Committee roles and decision sequence retained; detailed Program Processes v4 decision deadlines and appeal rules are not mapped.

These are gaps in this procedure guide. Completing a particular project requires its own evidence.

Rules behind this map

GCC 2.0 Program Framework ↗

Edition 4.0 · 2024

Reused foundation evidence; no current-edition refresh. GCC framework is high-level; separate Program Processes v4 PDF not acquired. Retained evidence reused on 2026-10-13; no live refresh. Publication date, capture date and applicability are distinct.
Project Registration & Issuance ↗

Edition not established · Publication date not established

Reused foundation evidence; no current-edition refresh. GCC framework is high-level; separate Program Processes v4 PDF not acquired. Retained evidence reused on 2026-10-13; no live refresh. Publication date, capture date and applicability are distinct.
GCC Project Standard ↗

Edition 4.0 · Publication date not established · Checked 2026-10-13

URL month is not a verified document date. GCC 2.0 applicability must be bound separately from historical GCC projects. Selected relevant primary-source sections through web retrieval; not whole-document QA
GCC Project Standard ↗

Edition 4.1 · Publication date not established · Checked 2026-10-14

GCC4.1 supplements the older4.0 framework/overview; no historic project is automatically moved to4.1. Selected applicant, design, SDG, assurance or label sections; not whole-rulebook QA.