Propose and establish
Define methodology, baseline, monitoring and safeguards; identify at least three SDG contributions using the mandatory SDGs Tool.
Choose a programme. Follow the applicant, the documents, the assessor and the decision that creates the units.
These boxes explain the procedure. A project’s actual approval and issuance need their own dated documents and registry events.
BioCarbon Standard 4.1 dated 2026-04-13 plus applicable SOP and methodology.
Jump to the process map ↓Project holder or authorized representative; legally registered person/entity for an account
Open the account with KYC and beneficial-ownership documentation, then submit the project and authorized representation documents.
SOP2.03 §16.1 explicitly permits legally registered natural persons and duly incorporated legal entities, subject to due diligence. Informal group/community status alone does not establish account eligibility; establish an eligible holder and representation.
Listed is public disclosure; Under Review and Registered have different meanings. Global CarbonTrace is infrastructure, not an extra credit programme.
BioCarbon Standard Operating Procedures ↗
Edition 2.03 · §§16.1–16.5
BioCarbon Standard ↗
Edition 4.1 · §§11–18,21–22
Types marked conditional require the named proponent/coordinator/holder role, rights, agreement and account approval. Not established is an evidence gap, not ineligibility.
Define methodology, baseline, monitoring and safeguards; identify at least three SDG contributions using the mandatory SDGs Tool.
Demonstrate the applicable monitored results and SDG criteria. Standard §17 explicitly links SDG noncompliance to issuance ineligibility.
CAB validation and verification assess SDG-tool criteria as well as carbon/method conformity. Evidence of a specific benefit is limited to the indicator and scope assessed.
A required SDG contribution, a voluntary label and a theory of change are different tests. The selected edition and product determine which applies.
Report contributions to at least three SDGs using the mandatory BioCarbon SDGs Tool; assess them at validation and verification. Failure of applicable SDG criteria makes the project ineligible for issuance.
BioCarbon Standard ↗
Edition 4.1 · §17, physical pp57–58
A universal separately named project ToC requirement is not established by the selected SDG and safeguard sections.
BioCarbon Standard ↗
Edition 4.1 · §§17–18
Project-selected SDGs, targets and evidence are being joined to the project catalog. A programme requirement does not identify a particular project’s chosen goals or establish delivery to a recipient.
Project design, baseline/additionality, monitoring and CAB assessment must conform to the programme and applicable methodology.
BioCarbon Standard ↗
Edition 4.1 · Project requirements; associated SOP design/CAB stages
Apply applicable safeguards; REDD+ has additional social/environmental safeguard provisions.
BioCarbon Standard ↗
Edition 4.1 · §18; referenced safeguards requirements
Natural person or legal entity / BioCarbon registry
Submit legal identity, authorization and due-diligence information to open the appropriate registry account. Account opening can precede project documentation or a credit purchase.
Use only the applicable native route, product, edition and period; actions are a working checklist, not additional normative requirements.
BioCarbon Standard Operating Procedures ↗
Edition 2.03 · §16.1, physical pp27-28
Project holder or authorized representative
Prepare the project description, methodology application and monitoring plan, and submit the registration request. A request may begin before validation is complete.
Use only the applicable native route, product, edition and period; actions are a working checklist, not additional normative requirements.
BioCarbon Standard Operating Procedures ↗
Edition 2.03 · §16.4, physical p33
BioCarbon Standard
Publish the submitted project. This initial status does not establish eligibility, validation, verification or technical approval.
Use only the applicable native route, product, edition and period; actions are a working checklist, not additional normative requirements.
BioCarbon Standard Operating Procedures ↗
Edition 2.03 · §16.3, physical pp31-32
Approved conformity assessment body (CAB)
Independently assess design and, where submitted, monitored mitigation. Final registration requires positive validation; a verified period requires the corresponding positive verification opinion.
Use only the applicable native route, product, edition and period; actions are a working checklist, not additional normative requirements.
BioCarbon Standard Operating Procedures ↗
Edition 2.03 · §16.2 and §16.5, physical pp29-31,35-37
BioCarbon technical committee
Review the project and CAB evidence, including applicable methodology, baseline, additionality, monitoring and safeguards; resolve findings.
Use only the applicable native route, product, edition and period; actions are a working checklist, not additional normative requirements.
BioCarbon Standard Operating Procedures ↗
Edition 2.03 · §16.3 and §16.4.2, physical pp31-32,34-35
BioCarbon Standard
Complete registration after the required validation, programme assessment and closure of findings. Registration does not substitute for an approved verification supporting issuance.
Use only the applicable native route, product, edition and period; actions are a working checklist, not additional normative requirements.
BioCarbon Standard Operating Procedures ↗
Edition 2.03 · §16.3 and §16.5, physical pp31-32,35-37
Project holder
Prepare reporting-period monitoring evidence for independent verification and programme review.
Use only the applicable native route, product, edition and period; actions are a working checklist, not additional normative requirements.
BioCarbon Standard Operating Procedures ↗
Edition 2.03 · §16.2 and §16.5, physical pp29-31,35-37
CAB / BioCarbon technical committee
Positive CAB verification and BioCarbon technical review are required to register the verified period before issuance.
Use only the applicable native route, product, edition and period; actions are a working checklist, not additional normative requirements.
BioCarbon Standard Operating Procedures ↗
Edition 2.03 · §16.5, physical pp35-37
Project holder / BioCarbon registry
Request issuance against accepted verified outcomes. Registry controls create serialized VCCs in applicable active or reserve accounts and an issuance statement.
Use only the applicable native route, product, edition and period; actions are a working checklist, not additional normative requirements.
BioCarbon Standard Operating Procedures ↗
Edition 2.03 · §16.7, physical pp43-44
Authorized account holder / registry
Use the authorized account roles to transfer or retire issued VCCs; retirement produces its own registry statement.
Use only the applicable native route, product, edition and period; actions are a working checklist, not additional normative requirements.
BioCarbon Standard Operating Procedures ↗
Edition 2.03 · §16.8, physical p44
Source-informed display order of functions, not a universal dependency chain. Use branch/pathway and ordering notes; repeated and combined assessments are possible.
A registration request/listing can begin before CAB work is complete; public entry is not completed conformity assessment.
Account and submission prerequisites mapped. Full activity, geographic and methodology eligibility must be checked in Standard v4.1 and applicable methodology.
Monitoring is a required verification input; complete methodology-specific monitoring instructions are outside this export.
These are gaps in this procedure guide. Completing a particular project requires its own evidence.
Edition 2.03 · 2026-06-15
Reused foundation evidence; no current-edition refresh. Retained evidence reused on 2026-10-13; no live refresh. Publication date, capture date and applicability are distinct.Edition 4.1 · 2026-04-13
Reused foundation evidence; no current-edition refresh. Retained evidence reused on 2026-10-13; no live refresh. Publication date, capture date and applicability are distinct.Edition 4.1 · 2026-04-13 · Checked 2026-10-13
Version-specific normative evidence; does not establish applicability to any Kenyan project or monitoring period. Selected relevant primary-source sections through web retrieval; not whole-document QA