Project → review → issued units

How a project
becomes credits.

Choose a programme. Follow the applicant, the documents, the assessor and the decision that creates the units.

Programme procedure · reviewed guidance, 2026-10-14

Cercarbono

These boxes explain the procedure. A project’s actual approval and issuance need their own dated documents and registry events.

Procedures 2.3.2 dated 2026-04-30; cited SDG Tool 1.3 body remains a gap.

Jump to the process map ↓
Start here

Who applies—and what do they need?

CCMP holder or authorized representative using EcoRegistry

Prepare the registration application and PDD, legal/ownership evidence and account due diligence; complete preliminary review and publication before VVB validation.

Procedures2.3.2 Table1 identifies applicant legal/ownership and governance documents plus an activated EcoRegistry account/framework agreement. The detailed natural-person and informal-group eligibility policy is not reproduced.

Registration/publication happens before validation. Historical voluntary SDG Tool1.1 is not a substitute for the current-tool check required by Procedures2.3.2.

Documents to assemble

  • Holder identity, ownership and representation documents
  • PDD and applicable methodology
  • Baseline/monitoring, public-comment responses and VVB evidence
  • Current SDG tool and safeguard assessments with findings closure
Applicant rule and clause

Procedures of Cercarbono's Certification Programme ↗
Edition 2.3.2 · §4.1 Table1; §§4.2–4.5,6.1

Types marked conditional require the named proponent/coordinator/holder role, rights, agreement and account approval. Not established is an evidence gap, not ineligibility.

Before design approval

Propose and establish

Prepare eligible PDD/methodology and safeguard evidence. Do not label early registration as validation or certification.

Before verified issuance

Monitor and demonstrate

VVB verifies monitored results and the completed SDG tool; certification reviews the SDG rubric and no-net-harm evidence under the 2026 procedure.

The documented VVB and certification checks are separate. Tool 1.1 voluntary language from 2021 does not establish the current tool obligation or scope.

Development goals are a separate requirement

Which goals must the project demonstrate?

A required SDG contribution, a voluntary label and a theory of change are different tests. The selected edition and product determine which applies.

Development goalsRequired in this edition

The 2026 procedures call for VVB checks of the completed SDG tool; certification of the SDG contribution also checks the VVB rubric.

When it applies: Exact Tool 1.3 body and edition hierarchy remain to be read

Requirement source and clause

Procedures of Cercarbono certification programme ↗
Edition 2.3.2 · §§4.4.1, 4.5, physical pp32,43

Development goalsOptional / recommended

Tool 1.1 (2021) calls reporting voluntary and disclaims robust impact verification; it cannot establish the current rule under Procedures 2.3.2 citing Tool 1.3.

When it applies: Historical-version comparison only

Requirement source and clause

Cercarbono SDG contribution tool ↗
Edition 1.1 · §§6.1–6.4, physical pp20–21

Required by the rulesChosen in project designMonitored indicatorAssessor’s finding

Project-selected SDGs, targets and evidence are being joined to the project catalog. A programme requirement does not identify a particular project’s chosen goals or establish delivery to a recipient.

Carbon method, safeguards, rights and benefit-sharing rules
Carbon accountingRequired in this edition

VVB assessment covers methodological eligibility, additionality, permanence, monitoring and evidence supporting the PDD and monitored results.

Procedures of Cercarbono certification programme ↗
Edition 2.3.2 · §4.4.1, physical p32

Follow the project process

Applicant / operatorAssessment / programme reviewIssued units
  1. 01

    Registration application

    CCMP holder / Cercarbono / EcoRegistry

    Submit the climate-change mitigation programme (CCMP) documentation, rights and legal information. Complete EcoRegistry due diligence, account activation and the framework agreement.

    signupeligibilitydesign
    What the applicant prepares
    • Confirm the named account/participant role and submit the required identity, authority and agreement documents.
    • Demonstrate eligibility for the selected activity, product and applicable rule editions.
    • Prepare the design package, baseline/additionality, monitoring plan and applicable consultation, safeguards and development-impact evidence.

    Use only the applicable native route, product, edition and period; actions are a working checklist, not additional normative requirements.

    Source and clause

    Procedures of Cercarbono's Certification Programme ↗
    Edition 2.3.2 · §4.1, Table 1, physical pp18-19

  2. 02

    CCMP publication

    Cercarbono / EcoRegistry

    After the preliminary review and applicable overlap checks, confirm registration and publish the CCMP. This registration step precedes independent validation.

    registration
    What the applicant prepares
    • Submit the native listing/registration package and retain the programme decision with its exact status.

    Use only the applicable native route, product, edition and period; actions are a working checklist, not additional normative requirements.

    Source and clause

    Procedures of Cercarbono's Certification Programme ↗
    Edition 2.3.2 · §4.1, Table 1, physical pp18-19

  3. 03

    Public comments on the CCMP

    Cercarbono / stakeholders / CCMP holder

    Expose project documentation to the public-comment process and address the applicable comments.

    design
    What the applicant prepares
    • Prepare the design package, baseline/additionality, monitoring plan and applicable consultation, safeguards and development-impact evidence.

    Use only the applicable native route, product, edition and period; actions are a working checklist, not additional normative requirements.

    Source and clause

    Procedures of Cercarbono's Certification Programme ↗
    Edition 2.3.2 · §4.2, physical pp19-20

  4. 04

    Validation of the CCMP

    Approved VVB

    Assess the PDD and conformity with applicable programme and methodology requirements. Validation can be combined with verification under the prescribed route.

    validation
    What the applicant prepares
    • Arrange the required independent or expressly permitted design assessment; answer findings and retain the final design opinion.

    Use only the applicable native route, product, edition and period; actions are a working checklist, not additional normative requirements.

    Source and clause

    Procedures of Cercarbono's Certification Programme ↗
    Edition 2.3.2 · §4.3, physical pp20-31

  5. 05

    Monitoring report

    CCMP holder

    Implement and monitor the CCMP, and prepare the period-specific evidence assessed in verification.

    monitoring
    What the applicant prepares
    • Implement the applicable monitoring plan for the actual period and keep supporting records separate from forecasts.

    Use only the applicable native route, product, edition and period; actions are a working checklist, not additional normative requirements.

    Source and clause

    Procedures of Cercarbono's Certification Programme ↗
    Edition 2.3.2 · §4.4 and §6.1, physical pp31-41,50

  6. 06

    CCMP verification

    Approved VVB

    Assess monitored reductions or removals and issue the verification result; a positive VVB outcome is distinct from programme certification.

    verification
    What the applicant prepares
    • Submit period evidence for the required assurance route; resolve findings and retain the opinion’s scope and limitations.

    Use only the applicable native route, product, edition and period; actions are a working checklist, not additional normative requirements.

    Source and clause

    Procedures of Cercarbono's Certification Programme ↗
    Edition 2.3.2 · §4.4, including §4.4.18 Table 4, physical pp31-41

  7. 07

    CCMP Certification

    Cercarbono certifier

    Review the complete project and VVB evidence, resolve required corrections and issue the certification report.

    issuer decision
    What the applicant prepares
    • Respond to programme review and retain its decision separately from independent assurance.

    Use only the applicable native route, product, edition and period; actions are a working checklist, not additional normative requirements.

    Source and clause

    Procedures of Cercarbono's Certification Programme ↗
    Edition 2.3.2 · §4.5, physical pp42-44

  8. 08

    Issuance

    Cercarbono / EcoRegistry

    Generate the Carboncer issuance certificate and serialized credits, including applicable buffer allocations. The certificate identifies the monitored period and the VVBs; Cercarbono signs the certificate.

    issuance
    What the applicant prepares
    • Request the eligible product and retain the actual completed issuance event; an approval or estimate alone is insufficient.

    Use only the applicable native route, product, edition and period; actions are a working checklist, not additional normative requirements.

    Source and clause

    Procedures of Cercarbono's Certification Programme ↗
    Edition 2.3.2 · §6.1, physical pp50-51

  9. 09

    Transfer

    Authorized account holder / EcoRegistry

    Transfer issued Carboncers between EcoRegistry accounts, changing the holding account and recording the transaction.

    transfer
    What the applicant prepares
    • For an eligible issued product, retain the completed account-movement record; assess commercial sale evidence separately.

    Use only the applicable native route, product, edition and period; actions are a working checklist, not additional normative requirements.

    Source and clause

    Procedures of Cercarbono's Certification Programme ↗
    Edition 2.3.2 · §6.4, physical pp56-57

  10. 10

    Retirement

    Authorized account holder / EcoRegistry

    Permanently allocate selected credits to an end-beneficiary and issue the retirement certificate; the credits cannot be reactivated.

    retirement
    What the applicant prepares
    • Check product-use eligibility and retain the completed retirement/cancellation record and named purpose or beneficiary.

    Use only the applicable native route, product, edition and period; actions are a working checklist, not additional normative requirements.

    Source and clause

    Procedures of Cercarbono's Certification Programme ↗
    Edition 2.3.2 · §6.3, physical pp54-56

Source-informed display order of functions, not a universal dependency chain. Use branch/pathway and ordering notes; repeated and combined assessments are possible.

What changes between programmes?

CCMP publication/registration follows preliminary checks and precedes independent validation in the retained procedure.

  • Order differs from Verra: registration/publication is before validation, verification and programme certification.
  • EcoRegistry hosts accounts and unit transactions; it is not counted as a second programme.
  • Do not confuse CCMP registration (§4.1) with registration and serial traceability of Carboncers (§6.2).

What still needs checking?

eligibility

partial

The submission and preliminary-compliance screen is mapped; full protocol and methodology eligibility is not reproduced.

These are gaps in this procedure guide. Completing a particular project requires its own evidence.

Rules behind this map

Cercarbono SDG contribution tool ↗

Edition 1.1 · 2021-09-28 · Checked 2026-10-13

Historical document. The newer Procedures 2.3.2 cite Tool 1.3 (2022); its older voluntary wording is not a safe current universal rule. Selected relevant primary-source sections through web retrieval; not whole-document QA
Procedures of Cercarbono certification programme ↗

Edition 2.3.2 · 2026-04-30 · Checked 2026-10-13

Version-specific normative evidence; does not establish applicability to any Kenyan project or monitoring period. Selected relevant primary-source sections through web retrieval; not whole-document QA