Project → review → issued units

How a project
becomes credits.

Choose a programme. Follow the applicant, the documents, the assessor and the decision that creates the units.

Programme procedure · reviewed guidance, 2026-10-14

International Carbon Registry (ICR)

These boxes explain the procedure. A project’s actual approval and issuance need their own dated documents and registry events.

Substantive requirements 6.1 are historical; 6.2 body not retrieved. Process 6.3 is a separate source.

Jump to the process map ↓
Start here

Who applies—and what do they need?

Project proponent using verified user/organization accounts

Complete the account and authorization process, document ownership/control, choose the method or justified criteria, and create the project draft/pre-registration submission.

Process6.3 sets account and pre-registration gates. Requirements6.1 §5.7 requires uncontested authority to represent, control and operate the project and own the instruments. The current requirements6.2 body is not established in the qualified source set; do not present6.1 as automatically current.

Ex-ante issuance is a conditional future-mitigation product; it cannot be treated as verified ex-post issuance or retired for an offset claim before conversion.

Documents to assemble

  • Verified organization/user and authorization documents
  • Project and instrument-rights evidence
  • PDD, baseline/project quantification and MRV plan
  • ESES-SD assessment, stakeholder consultation and risk/rating evidence
Applicant rule and clause

ICR Process Requirements ↗
Edition 6.3 · §§4.4–6

ICR Requirement Document ↗
Edition 6.1 historical branch · §§5.7–5.9,6.2,6.7–6.8

Types marked conditional require the named proponent/coordinator/holder role, rights, agreement and account approval. Not established is an evidence gap, not ineligibility.

Before design approval

Propose and establish

Establish rights, methodology and environmental/social safeguards. Host SDG consistency is recommended; claimed contributions need the ESES-SD tool, PDD disclosure and monitoring.

Before verified issuance

Monitor and demonstrate

For ex-post ICCs, monitor and verify occurred mitigation and claimed SDG contributions; complete ICR review. Ex-ante units use a separate validated-future route.

Validation checks criteria and projected claims; verification tests monitored statements. Current substantive 6.2 changes cannot be inferred from historical 6.1.

Development goals are a separate requirement

Which goals must the project demonstrate?

A required SDG contribution, a voluntary label and a theory of change are different tests. The selected edition and product determine which applies.

Development goalsDepends on the route or condition

Host-country SDG consistency is recommended; claimed SDG contributions require the ESES-SD tool, PDD disclosure, monitoring, validation and verification.

When it applies: An SDG contribution is claimed under the applicable historical/current requirements edition.

Requirement source and clause

ICR Requirement Document ↗
Edition 6.1 historical branch · §5.9

Causal logic / theory of changeNot established in this review

No separately named universal ToC requirement established in the inspected sections.

Requirement source and clause

ICR Requirement Document ↗
Edition 6.1 historical branch · Selected §§5.9, 6.2, 6.7–6.8

Required by the rulesChosen in project designMonitored indicatorAssessor’s finding

Project-selected SDGs, targets and evidence are being joined to the project catalog. A programme requirement does not identify a particular project’s chosen goals or establish delivery to a recipient.

Carbon method, safeguards, rights and benefit-sharing rules
Carbon accountingRequired in this edition

Select methodology criteria or establish justified criteria and quantify baseline/project differences; grouped instances have separate eligibility conformity requirements.

When it applies: Historical v6.1; current v6.2 body unresolved

ICR Requirement Document ↗
Edition 6.1 historical branch · §§6.7–6.8, §7

SafeguardsRequired in this edition

Use the environmental/social safeguards tool and monitoring report; respect property rights and engage local stakeholders.

ICR Requirement Document ↗
Edition 6.1 historical branch · §§6.2.1–6.2.1.1

Choose the product route

Risk assessment can begin earlier; ex-post issuance depends on verified outcomes and ICR acceptance.

Applicant / operatorAssessment / programme reviewIssued units
  1. 01

    Accounts

    User / organization / ICR

    Complete user and organization accounts, verification, agreements and required authorization before requesting the relevant action.

    signup
    What the applicant prepares
    • Confirm the named account/participant role and submit the required identity, authority and agreement documents.

    Use only the applicable native route, product, edition and period; actions are a working checklist, not additional normative requirements.

    Source and clause

    ICR Process Requirements ↗
    Edition 6.3 · §4.4, especially §4.4.5

  2. 02

    Preconditions for project registration

    Project proponent / ICR

    Demonstrate rights, representation, methodology and documentation requirements; account and project eligibility are separate checks.

    eligibilitydesign
    What the applicant prepares
    • Demonstrate eligibility for the selected activity, product and applicable rule editions.
    • Prepare the design package, baseline/additionality, monitoring plan and applicable consultation, safeguards and development-impact evidence.

    Use only the applicable native route, product, edition and period; actions are a working checklist, not additional normative requirements.

    Source and clause

    ICR Process Requirements ↗
    Edition 6.3 · §5

  3. 03

    Draft project; Pre-registration

    Project proponent / ICR

    Create a draft and seek pre-registration under the applicable under-development or under-validation status. These statuses do not establish registration or issuance.

    registration
    What the applicant prepares
    • Submit the native listing/registration package and retain the programme decision with its exact status.

    Use only the applicable native route, product, edition and period; actions are a working checklist, not additional normative requirements.

    Source and clause

    ICR Process Requirements ↗
    Edition 6.3 · §§6.2-6.3

  4. 04

    Validation

    Approved VVB

    Assess design conformity and suitability for registration after pre-registration; upload the validation result.

    validation
    What the applicant prepares
    • Arrange the required independent or expressly permitted design assessment; answer findings and retain the final design opinion.

    Use only the applicable native route, product, edition and period; actions are a working checklist, not additional normative requirements.

    Source and clause

    ICR Process Requirements ↗
    Edition 6.3 · §6.4

  5. 05

    ICR review and registration

    ICR

    Review the project and accept it into the programme. Registration does not guarantee later issuance, conversion or market eligibility.

    issuer decisionregistration
    What the applicant prepares
    • Respond to programme review and retain its decision separately from independent assurance.
    • Submit the native listing/registration package and retain the programme decision with its exact status.

    Use only the applicable native route, product, edition and period; actions are a working checklist, not additional normative requirements.

    Source and clause

    ICR Process Requirements ↗
    Edition 6.3 · §6.5

  6. 06

    Project rating and risk assessment

    ICR / rating agency / approved risk assessor

    Complete applicable rating and risk requirements; these may begin earlier and can condition issuance and continued listing.

    eligibility
    What the applicant prepares
    • Demonstrate eligibility for the selected activity, product and applicable rule editions.

    Use only the applicable native route, product, edition and period; actions are a working checklist, not additional normative requirements.

    Source and clause

    ICR Process Requirements ↗
    Edition 6.3 · §6.6 and §10

  7. 07

    Monitoring

    Project proponent

    Collect and report monitoring-period evidence under the MRV plan.

    monitoring
    What the applicant prepares
    • Implement the applicable monitoring plan for the actual period and keep supporting records separate from forecasts.

    Use only the applicable native route, product, edition and period; actions are a working checklist, not additional normative requirements.

    Source and clause

    ICR Process Requirements ↗
    Edition 6.3 · §6.7

  8. 08

    Under Verification

    Approved VVB

    Verify the reported mitigation. The status means the process is underway, not that a positive opinion or issuance already exists.

    verification
    What the applicant prepares
    • Submit period evidence for the required assurance route; resolve findings and retain the opinion’s scope and limitations.

    Use only the applicable native route, product, edition and period; actions are a working checklist, not additional normative requirements.

    Source and clause

    ICR Process Requirements ↗
    Edition 6.3 · §6.8

  9. 09

    ICR review after verification

    ICR

    Review monitoring and verification evidence and resolve findings before ex-post issuance or ex-ante conversion.

    issuer decision
    What the applicant prepares
    • Respond to programme review and retain its decision separately from independent assurance.

    Use only the applicable native route, product, edition and period; actions are a working checklist, not additional normative requirements.

    Source and clause

    ICR Process Requirements ↗
    Edition 6.3 · §6.9

  10. 10

    ICR confirmation of issuance

    ICR

    Confirm the supported quantity, type, serials and delivery after the applicable review, fees and deductions.

    issuance
    What the applicant prepares
    • Request the eligible product and retain the actual completed issuance event; an approval or estimate alone is insufficient.

    Use only the applicable native route, product, edition and period; actions are a working checklist, not additional normative requirements.

    Source and clause

    ICR Process Requirements ↗
    Edition 6.3 · §§7.1-7.6 and §§7.9,7.14

  11. 11

    Transfers, retirements, cancellations, and use of ICCs

    Account holder / ICR

    Permitted transfers differ by product and restrictions. Ex-ante ICCs cannot support retirement or offsetting claims until converted to ex-post ICCs.

    transferretirement
    What the applicant prepares
    • For an eligible issued product, retain the completed account-movement record; assess commercial sale evidence separately.
    • Check product-use eligibility and retain the completed retirement/cancellation record and named purpose or beneficiary.

    Use only the applicable native route, product, edition and period; actions are a working checklist, not additional normative requirements.

    Source and clause

    ICR Process Requirements ↗
    Edition 6.3 · §8, especially §§8.3-8.7

Source-informed display order of functions, not a universal dependency chain. Use branch/pathway and ordering notes; repeated and combined assessments are possible.

What changes between programmes?

Account/preconditions, draft project and validation precede the relevant registration decision.

  • Pre-registration, validation, programme registration and issuance are separate events.
  • Ex-ante issuance branches before monitoring/verification; conversion rejoins after verification and ICR review.
  • Ratings and risk assessments can occur across stages and are not substitute VVB or issuer decisions.

What still needs checking?

eligibility

partial

Process preconditions are mapped; full technical eligibility still depends on ICR requirements, the applicable methodology and product rules.

These are gaps in this procedure guide. Completing a particular project requires its own evidence.

Rules behind this map

ICR Process Requirements ↗

Edition 6.3 · 2026-06-16

Keep ex-ante and ex-post ICC pathways distinct. Retained evidence reused on 2026-10-13; no live refresh. Publication date, capture date and applicability are distinct.
ICR Requirement Document ↗

Edition 6.1 historical branch · Publication date not established · Checked 2026-10-13

v6.1 URL redirects to history beneath v6.2. Current v6.2 retrieval failed; these substantive rules are historical version evidence, separate from retained Process Requirements v6.3. Selected relevant primary-source sections through web retrieval; not whole-document QA