Project → review → issued units

How a project
becomes credits.

Choose a programme. Follow the applicant, the documents, the assessor and the decision that creates the units.

Programme procedure · reviewed guidance, 2026-10-14

Plan Vivo / PV Climate

These boxes explain the procedure. A project’s actual approval and issuance need their own dated documents and registry events.

PV Climate Project Requirements 5.7; process 3.9 and applicable product label/scale.

Jump to the process map ↓
Start here

Who applies—and what do they need?

Project coordinator working with eligible project participants

Organize the coordinator and participants, prepare the PIN, and establish land/resource/carbon rights before participatory PDD design.

Requirements5.7 §§2.2–2.3 distinguish the coordinator organization from resident subsistence/small-scale resource managers. Individuals and groups can participate; the stated exception for other participants is conditional, including a less-than30% area limit and no acquisition from smallholders for inclusion.

A farmer joining a project and a coordinator applying for certification follow different roles. fPVC, rPVC and vPVC products must keep separate evidence gates.

Documents to assemble

  • PIN and coordinator governance/capacity
  • Participant/land-management agreements and rights
  • Participatory project logic and technical specifications
  • Benefit-sharing mechanism and progress/carbon/livelihood/ecosystem monitoring plans
Applicant rule and clause

PV Climate Project Requirements V5.7.pdf ↗
Edition 5.7 · §§1.2,2.2–2.6,3.5–3.6,3.16–3.18,4.1–4.5

PV Climate Procedures Manual V3.9.pdf ↗
Edition 3.9 · §§2,4–6

Types marked conditional require the named proponent/coordinator/holder role, rights, agreement and account approval. Not established is an evidence gap, not ineligibility.

Before design approval

Propose and establish

Prepare Project Logic, Technical Specifications, livelihood/ecosystem indicators, participation/FPIC and risk arrangements. Agree a benefit-sharing mechanism, eligible recipients, timing and dependencies.

Before verified issuance

Monitor and demonstrate

Report monitored carbon, livelihood/ecosystem indicators and benefit sharing. The 60% rule concerns certificate-sale income after host charges/taxes benefiting participants/local stakeholders across the crediting period; benefits may include training and in-kind support.

Independent verification supports vPVC claims. fPVC and rPVC describe different evidence states and cannot be displayed as independently verified delivery.

Development goals are a separate requirement

Which goals must the project demonstrate?

A required SDG contribution, a voluntary label and a theory of change are different tests. The selected edition and product determine which applies.

Causal logic / theory of changeRequired in this edition

Project Logic must explain causal links, assumptions and expected carbon, livelihood and ecosystem benefits relative to baseline.

Requirement source and clause

PV Climate Project Requirements ↗
Edition 5.7 · §3.5, physical p20

Development goalsRequired in this edition

Livelihood and ecosystem indicators must relate to SDGs and, where relevant and feasible, host-country objectives.

Requirement source and clause

PV Climate Project Requirements ↗
Edition 5.7 · §§4.3–4.4, physical pp37–38

Required by the rulesChosen in project designMonitored indicatorAssessor’s finding

Project-selected SDGs, targets and evidence are being joined to the project catalog. A programme requirement does not identify a particular project’s chosen goals or establish delivery to a recipient.

Carbon method, safeguards, rights and benefit-sharing rules
Carbon accountingRequired in this edition

Use an approved methodology and intervention-specific Technical Specifications; monitor carbon, progress, livelihood and ecosystem indicators.

PV Climate Project Requirements ↗
Edition 5.7 · §§3.6, 4.2–4.5

Community rights and benefit sharingRequired in this edition

Agree a benefit-sharing mechanism. At least 60% of certificate-sale income after host-country charges/taxes must directly benefit participants/local stakeholders; cash, training and in-kind allocations and dependencies must be specified.

When it applies: Guidance allows individual issuances below 60% if total across the crediting period is at least 60%; not an individual cash-payment floor

PV Climate Project Requirements ↗
Edition 5.7 · §3.16; guidance physical pp33–34

SafeguardsRequired in this edition

Stakeholder participation, FPIC, risk management and a grievance mechanism apply under the project requirements.

PV Climate Project Requirements ↗
Edition 5.7 · §§2.5–2.6, 3.9–3.12, 3.17

Choose the product route

Conditional future-certificate route. Where eligible, fPVCs can be issued after validation/registration without a prior annual reporting period. Ongoing reporting, later verification and conversion remain distinct; this is not an ex-post verified credit at first issuance. Website display separates the retained combined future-or-reported pathway.

Applicant / operatorAssessment / programme reviewIssued units
  1. 01

    Project Screening

    Project coordinator / Plan Vivo

    Submit a Project Idea Note (PIN) for review of proposed activities, rights, stakeholders, governance and basic eligibility. Approved PINs enter the pipeline.

    signupeligibility
    What the applicant prepares
    • Confirm the named account/participant role and submit the required identity, authority and agreement documents.
    • Demonstrate eligibility for the selected activity, product and applicable rule editions.

    Use only the applicable native route, product, edition and period; actions are a working checklist, not additional normative requirements.

    Source and clause

    PV Climate Procedures Manual V3.9.pdf ↗
    Edition 3.9 · §§1-2, physical pp7-9

  2. 02

    PDD Submission; PDD Screening; PDD Review

    Project coordinator / Plan Vivo / technical reviewer

    Submit the project design for completeness, requirements and technical review, including public consultation and resolution of findings.

    design
    What the applicant prepares
    • Prepare the design package, baseline/additionality, monitoring plan and applicable consultation, safeguards and development-impact evidence.

    Use only the applicable native route, product, edition and period; actions are a working checklist, not additional normative requirements.

    Source and clause

    PV Climate Procedures Manual V3.9.pdf ↗
    Edition 3.9 · §§4.1-4.3 and §§5.1-5.2, physical pp13-17

  3. 03macro branch

    Validation

    Approved VVB

    Macroscale route uses an approved VVB to validate the project design and close outstanding findings.

    validation
    What the applicant prepares
    • Arrange the required independent or expressly permitted design assessment; answer findings and retain the final design opinion.

    Use only the applicable native route, product, edition and period; actions are a working checklist, not additional normative requirements.

    Source and clause

    PV Climate Procedures Manual V3.9.pdf ↗
    Edition 3.9 · §4.4, physical pp14-16

  4. 04

    Registration

    Project coordinator / Plan Vivo

    After successful validation, sign an MoU and obtain the project registration certificate.

    registration
    What the applicant prepares
    • Submit the native listing/registration package and retain the programme decision with its exact status.

    Use only the applicable native route, product, edition and period; actions are a working checklist, not additional normative requirements.

    Source and clause

    PV Climate Procedures Manual V3.9.pdf ↗
    Edition 3.9 · §§6-6.1, physical pp19-20

  5. 05

    PV Climate Registry

    Project coordinator / S&P Global

    Complete coordinator-account due diligence and the project account process. Registry account acceptance is a separate prerequisite to generating PVCs.

    signup
    What the applicant prepares
    • Confirm the named account/participant role and submit the required identity, authority and agreement documents.

    Use only the applicable native route, product, edition and period; actions are a working checklist, not additional normative requirements.

    Source and clause

    PV Climate Procedures Manual V3.9.pdf ↗
    Edition 3.9 · §6.2, physical pp20-21

  6. 06

    Plan Vivo Certificates (PVCs)

    Plan Vivo / PV Climate Registry

    Issue the correct unit type: fPVC for expected removal delivery, rPVC for monitored but not independently verified delivery, or vPVC for independently verified achieved benefits.

    issuance
    What the applicant prepares
    • Request the eligible product and retain the actual completed issuance event; an approval or estimate alone is insufficient.

    Use only the applicable native route, product, edition and period; actions are a working checklist, not additional normative requirements.

    Source and clause

    PV Climate Procedures Manual V3.9.pdf ↗
    Edition 3.9 · §14, Table 4, physical pp32-34

  7. 07

    Annual Reports

    Project coordinator / Plan Vivo

    Submit monitoring results and any issuance request; Plan Vivo reviews reports. Annual-report approval can support fPVC/rPVC issuance where applicable.

    monitoringissuer decision
    What the applicant prepares
    • Implement the applicable monitoring plan for the actual period and keep supporting records separate from forecasts.
    • Respond to programme review and retain its decision separately from independent assurance.

    Use only the applicable native route, product, edition and period; actions are a working checklist, not additional normative requirements.

    Source and clause

    PV Climate Procedures Manual V3.9.pdf ↗
    Edition 3.9 · §7, physical pp21-22

  8. 08

    Verification

    Approved VVB or eligible microscale route / Plan Vivo

    Verify achieved carbon benefits and project implementation; Plan Vivo approves the final report before further vPVC issuance.

    verificationissuer decision
    What the applicant prepares
    • Submit period evidence for the required assurance route; resolve findings and retain the opinion’s scope and limitations.
    • Respond to programme review and retain its decision separately from independent assurance.

    Use only the applicable native route, product, edition and period; actions are a working checklist, not additional normative requirements.

    Source and clause

    PV Climate Procedures Manual V3.9.pdf ↗
    Edition 3.9 · §8, physical pp22-24

  9. 09

    Conversion of PVCs

    Plan Vivo / PV Climate Registry

    Monitoring and verification support conversion between future, reported and verified units. A conversion is a linked unit event, not automatically new additional supply.

    issuance
    What the applicant prepares
    • Request the eligible product and retain the actual completed issuance event; an approval or estimate alone is insufficient.

    Use only the applicable native route, product, edition and period; actions are a working checklist, not additional normative requirements.

    Source and clause

    PV Climate Procedures Manual V3.9.pdf ↗
    Edition 3.9 · §15.2, Table 5, physical p35

Source-informed display order of functions, not a universal dependency chain. Use branch/pathway and ordering notes; repeated and combined assessments are possible.

What changes between programmes?

PDD review and the applicable macro/microscale assessment lead to registration. Product issuance has more than one route.

  • This v3.9 procedure maps PV Climate; do not apply it retroactively to V4-era Markit events.
  • Account creation appears after validation/registration in the described flow, not as a universal first gate.
  • The flow is branched: fPVC/rPVC issuance can precede independent verification. CCP/CORSIA requirements constrain the chosen audit route.
  • Guidance allows individual issuances below 60% if the crediting-period total meets the rule. This is not a personal cash entitlement or a sale observed in this study.

What still needs checking?

eligibility

partial

The PIN screen is mapped; complete project eligibility remains governed by Project Requirements v5.7 and the applicable methodology.

These are gaps in this procedure guide. Completing a particular project requires its own evidence.

Rules behind this map

PV Climate Procedures Manual V3.9.pdf ↗

Edition 3.9 · Publication date not established

Capture 2026-08-13 is not a publication date. Historical V4 source retained as an applicability pointer, not substituted into the current PV Climate product pathway. Retained evidence reused on 2026-10-13; no live refresh. Publication date, capture date and applicability are distinct.
PV Climate Project Requirements V5.7.pdf ↗

Edition 5.7 · Publication date not established

Capture 2026-08-13 is not a publication date. Historical V4 source retained as an applicability pointer, not substituted into the current PV Climate product pathway. Retained evidence reused on 2026-10-13; no live refresh. Publication date, capture date and applicability are distinct.
Plan Vivo Procedures Manual V4.pdf ↗

Edition V4-era procedures · Publication date not established

Capture 2026-08-13 is not a publication date. Historical V4 source retained as an applicability pointer, not substituted into the current PV Climate product pathway. Retained evidence reused on 2026-10-13; no live refresh. Publication date, capture date and applicability are distinct.
PV Climate Project Requirements ↗

Edition 5.7 · 2026-04-30 · Checked 2026-10-13

Date found in document history, physical page 52. Does not rewrite retained source-owner metadata where date was unknown. Selected relevant primary-source sections through web retrieval; not whole-document QA