Project → review → issued units

How a project
becomes credits.

Choose a programme. Follow the applicant, the documents, the assessor and the decision that creates the units.

Programme procedure · reviewed guidance, 2026-10-14

Puro Standard

These boxes explain the procedure. A project’s actual approval and issuance need their own dated documents and registry events.

SDG Assessment 2024 v1.0; detailed September 2026 Certification Procedures 1.2 remain unread. General Rules4.4 (2026-05-07) supplies additional mandatory gates in this pass.

Jump to the process map ↓
Start here

Who applies—and what do they need?

CO2 Removal Supplier representing an eligible production facility

Select the removal methodology, complete KYC and the Platform Agreement, and register the production facility with evidence of authority and CORC rights.

General Rules4.4 defines the supplier as an account holder, including a project owner/developer/participant or facility owner/operator. The supplier represents the participants needed for end-to-end removal. A signatory needs legal authority; this does not establish that every individual or informal group can open an account.

Facility registration, independent Facility Audit, issuer Facility Review, independent Output Audit, issuer Output Review and CORC issuance are distinct.

Documents to assemble

  • KYC, Platform Agreement and facility registration
  • Facility ownership and/or legal CORC rights
  • Methodology-specific facility package, LCA/net-removal accounting and uncertainty
  • Baseline/additionality, monitoring, stakeholder consultation, safeguards and positive SDG impacts
Applicant rule and clause

Puro Standard General Rules ↗
Edition 4.4 · §§1.1.4,2.2.4,3.1.2,6; Definitions: CO2 Removal Supplier

Types marked conditional require the named proponent/coordinator/holder role, rights, agreement and account approval. Not established is an evidence gap, not ineligibility.

Before design approval

Propose and establish

Establish eligibility under the applicable removal methodology and safeguards. Claimed SDG descriptions are validated at facility audit.

Before verified issuance

Monitor and demonstrate

Document removal outputs under the applicable method. Claimed SDG performance needs ex-post evidence at output audit; quantitative Attributes and qualitative Descriptors remain distinct.

Facility audit evaluates design/conformity; output audit evaluates delivered removals and claimed SDG evidence for the specified period.

Development goals are a separate requirement

Which goals must the project demonstrate?

A required SDG contribution, a voluntary label and a theory of change are different tests. The selected edition and product determine which applies.

Development goalsDepends on the route or condition

SDG descriptions are validated at facility audit; ex-post evidence is verified at output audit. Quantified SDG Attributes differ from qualitative Descriptors and can apply to a specified later period.

When it applies: SDG description/Attribute/Descriptor is claimed, with its specified audit period.

Requirement source and clause

Puro SDG Assessment Requirements ↗
Edition Edition 2024 v1.0 · §§2.1–2.2, physical pp4–5

Causal logic / theory of changeNot established in this review

No universal named project ToC requirement established from the selected overview and SDG guidance.

Requirement source and clause

Puro SDG Assessment Requirements ↗
Edition Edition 2024 v1.0 · §§1–2

Development goalsRequired in this edition

Describe expected positive SDG impacts before the Facility Audit; provide qualitative and quantitative positive-impact evidence for the Output Audit. Host-country SDG consistency applies where relevant and feasible.

The General Rules require expected-impact descriptions and output evidence. Optional quantified Attributes versus Descriptors remain a separate product/reporting distinction in SDG Assessment Requirements1.0.

When it applies: Apply General Rules4.4 to the relevant facility/output period; methodology and SDG Assessment Requirements remain additional.

Requirement source and clause

Puro Standard General Rules ↗
Edition 4.4 · §§2.2.4.2,6.6.1–6.6.3, physical pp8,21

Required by the rulesChosen in project designMonitored indicatorAssessor’s finding

Project-selected SDGs, targets and evidence are being joined to the project catalog. A programme requirement does not identify a particular project’s chosen goals or establish delivery to a recipient.

Carbon method, safeguards, rights and benefit-sharing rules
Carbon accountingDepends on the route or condition

Qualify a facility against the applicable carbon-removal methodology; facility and output audits are distinct gates.

When it applies: Selected removal methodology and eligible facility/output pathway.

Certification journey ↗
Unversioned source · Certification journey: Facility Audit / Output Audit

SafeguardsDepends on the route or condition

The SDG guidance separates positive impacts from safeguards against negative impacts addressed at methodology level.

When it applies: Safeguard clauses in the selected removal methodology apply.

Puro SDG Assessment Requirements ↗
Edition Edition 2024 v1.0 · §1, physical p3

Community rights and benefit sharingNot established in this review

The library lists Stakeholder Engagement Requirements 1.1; detailed clauses and applicability are not established in this pass.

Puro document library ↗
Edition Live list observed 2026-10-13 · Standard Requirements list

Choose the product route

Transfer is a later holder action involving issued CORCs; it does not establish a price, payment or a new removal.

Applicant / operatorAssessment / programme reviewIssued units
  1. 01

    CORC Issuances

    Puro.earth / Puro Registry

    CO2 Removal Certificates are issued in the Puro Registry after the described audit path. The retained overview does not detail the separate issuer sign-off steps.

    issuance
    What the applicant prepares
    • Request the eligible product and retain the actual completed issuance event; an approval or estimate alone is insufficient.

    Use only the applicable native route, product, edition and period; actions are a working checklist, not additional normative requirements.

    Source and clause

    Certification journey ↗
    Unversioned source · Certification journey / CORC Issuances (expanded panel)

  2. 02

    Transfer of Ownership

    Authorized account holder / Puro Registry

    An authorized account holder requests movement of issued CORCs between accounts; ownership movement does not alone establish price or payment.

    transfer
    What the applicant prepares
    • An authorized account holder requests movement of issued CORCs between accounts; ownership movement does not alone establish price or payment.

    Source and clause

    Puro Standard General Rules ↗
    Edition 4.4 · §4.2

Source-informed display order of functions, not a universal dependency chain. Use branch/pathway and ordering notes; repeated and combined assessments are possible.

What changes between programmes?

Agreement/facility registration is distinct from facility conformity and output audit.

  • Preserve Facility Audit and Output Audit terminology rather than renaming both to Verra gates.
  • Certification Procedures v1.2 (September 2026) is listed in the retained library, but its PDF body is not retained. The process here is an overview-level export.
  • Transfer and retirement are optional later holder actions shown after issuance; this display does not require transfer before retirement.
  • General Rules4.4 §2.3.4 permits combined Facility/Output Audit and combined issuer review. Separate decisions describe assurance scope, not a mandatory wait between two audits.

What still needs checking?

eligibility

partial

Exact activity and methodology eligibility not mapped from the overview.

design

partially resolved by general rules44

General Rules4.4 now supplies the mapped package/review or unit-transaction gate. Detailed Certification Procedures1.2 and methodology-specific implementation remain additional.

monitoring

partial

Reporting-period output evidence is described; detailed monitoring specifications not retained.

issuer decision

partially resolved by general rules44

General Rules4.4 now supplies the mapped package/review or unit-transaction gate. Detailed Certification Procedures1.2 and methodology-specific implementation remain additional.

transfer

partially resolved by general rules44

General Rules4.4 now supplies the mapped package/review or unit-transaction gate. Detailed Certification Procedures1.2 and methodology-specific implementation remain additional.

retirement

partially resolved by general rules44

General Rules4.4 now supplies the mapped package/review or unit-transaction gate. Detailed Certification Procedures1.2 and methodology-specific implementation remain additional.

These are gaps in this procedure guide. Completing a particular project requires its own evidence.

Rules behind this map

Certification journey ↗

Edition not established · Publication date not established

Unversioned explanatory page, with facility/output/issuance panels expanded; not a substitute for the full certification procedure. Retained evidence reused on 2026-10-13; no live refresh. Publication date, capture date and applicability are distinct.
Puro document library ↗

Edition Certification Procedures 1.2 listed · September 2026

Lists Certification Procedures v1.2. PDF body was not acquired in the retained pass; no clauses attributed to that unread PDF. Retained evidence reused on 2026-10-13; no live refresh. Publication date, capture date and applicability are distinct.
Puro SDG Assessment Requirements ↗

Edition Edition 2024 v1.0 · 2024-03-01 · Checked 2026-10-13

Version-specific normative evidence; does not establish applicability to any Kenyan project or monitoring period. Selected relevant primary-source sections through web retrieval; not whole-document QA
Puro document library ↗

Edition Live list observed 2026-10-13 · Publication date not established · Checked 2026-10-13

Lists Certification Procedures 1.2 (September 2026), Common Criteria 1.0, General Rules 4.4 and SDG Assessment 1.0. Procedures PDF URL found, but web and direct fetch failed; no body clauses inferred. Selected relevant primary-source sections through web retrieval; not whole-document QA
Puro Standard General Rules ↗

Edition 4.4 · 2026-05-07 · Checked 2026-10-14

Publication date and access date differ; applicable methodology, corrections and transition rules still need a project-specific decision. Selected applicant, design, SDG, assurance or label sections; not whole-rulebook QA.